My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-01-17 EDC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Economic Development Commission (EDC)
>
EDC Packets
>
2017
>
03-01-17 EDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2017 3:42:01 PM
Creation date
6/13/2017 3:41:23 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Proposal to Provide Planning Services for a Small Area Study for the City of Arden Hills <br />Proposer Qualifi cations & Experience / 9 <br />City of Savage Re-Development Plan <br />Contact: Bryan Tucker, Planning Director; 952-882-2692; <br />btucker@ci.savage.mn.us <br />WSB is currently completing a Re-Development Plan for the City of Savage for an area along a visible <br />Highway 13 near Highway 101. Consisting of a variety of industrial properties, this study includes the <br />identifi cation and inventory of the businesses within the study area, in person interviews with businesses and <br />property owners, and an analysis of policymakers’ visions and goals for the area. <br />Ramsey Shovel Ready Certifi cation <br />Contact: Patrick Brama, Assistant City Administrator; <br />(763) 433-9903, pbrama@ci.ramsey.mn.us <br />WSB was engaged to complete the information required for 5 sites in the <br />City of Ramsey to be certifi ed in Minnesota Department of Employment <br />and Economic Development Shovel ready program. This program allows <br />for communities to identify sites for future development and complete the <br />information that will be required for new development and site selectors. <br />The information that is required and was completed by WSB included: ALTA <br />surveys, Title work, Geotechnical reports, Environmental review including <br />Phase 1 and Phase 2 studies, and Development materials.
The URL can be used to link to this page
Your browser does not support the video tag.