My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-17-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
07-24-17-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 4:05:08 PM
Creation date
7/21/2017 10:29:26 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
193361v2 <br /> B. The plan shall include, but not be limited to, the following information: <br /> 1. The locations and the estimated beginning and ending dates of all projects to be <br />commenced during the next calendar year (in this section, a "next-year project"); and <br /> 2. To the extent known, the tentative locations and estimated beginning and ending dates <br />for all projects contemplated for the five years following the next calendar year (in this section, a <br />"five-year project"). <br /> 3. The term "project" in this section shall include both next-year projects and five-year <br />projects. <br /> C. By January 1 of each year the City will have available for inspection in the City's office <br />a composite list of all projects of which the City has been informed of the annual plans. All <br />registrants are responsible for keeping themselves informed of the current status of this list. <br /> D. Thereafter, by February 1, each registrant may change any project in its list of next-year <br />projects, and must notify the City and all other registrants of all such changes in said list. <br />Notwithstanding the foregoing, a registrant may at any time join in a next-year project of another <br />registrant listed by the other registrant. <br /> Subd. 2 Additional Next-Year Projects. Notwithstanding the foregoing, the City will not <br />deny an application for a right-of-way permit for failure to include a project in a plan submitted <br />to the City if the registrant has used commercially reasonable efforts to anticipate and plan for <br />the project. <br />360.08 Permit Requirement. <br /> Subd. 1 Permit Required. Except as otherwise provided in this code, no person may obstruct <br />or excavate any right-of-way, or place any facilities or structures within the right-of-way, <br />without first having obtained the appropriate right-of-way permit from the City to do so. <br /> A. Excavation permit. An excavation permit is required by a registrant to excavate that <br />part of the right-of-way described in such permit and to hinder free and open passage over the <br />specified portion of the right-of-way by placing facilities described therein, to the extent and for <br />the duration specified therein. <br /> B. Obstruction permit. An obstruction permit is required by a registrant to hinder free and <br />open passage over the specified portion of right-of-way by placing equipment described therein <br />on, under or over the right-of-way, to the extent and for the duration specified therein. <br /> C. Wireless permit. A wireless permit is required by a registrant to site a new wireless <br />facility, wireless backhaul line, wireless support structure, small wireless facility, or to collocate <br />a small wireless facility in a public right of way managed by the City. <br /> <br /> Subd. 2 Permit Extensions. No person may excavate or obstruct the right-of-way beyond the <br />date or dates specified in the permit unless: <br /> A. Such person makes a supplementary application for another right-of-way permit before <br />the expiration of the initial permit; and <br />Deleted: An obstruction permit is not required if a <br />person already possesses a valid excavation permit <br />for the same project.
The URL can be used to link to this page
Your browser does not support the video tag.