My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
08-14-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 3:46:41 PM
Creation date
8/10/2017 3:41:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
540 Gateway Boulevard | Suite 100 | Burnsville, MN 55337 | (952) 737-4660 <br /> <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com <br /> <br /> <br />August 9, 2017 <br /> <br /> <br />Ms. Sue Polka, PE <br />Public Works Director <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />Re: Geotechnical Report <br />2018 PMP Streets <br />WSB Project No.: 010111-000 <br /> <br /> <br />We have conducted a geotechnical subsurface exploration program for the above referenced project. <br />This report contains our soil boring logs, an evaluation of the conditions encountered in the borings and <br />our recommendations for suitable pavement section, utility installation, and other geotechnical related <br />design and construction considerations. <br /> <br />If you have any questions concerning this report or our recommendations, or for construction material <br />testing for this project, please call us at (952) 737-4660. <br /> <br />Sincerely, <br /> <br />WSB & Associates, Inc. <br /> <br /> <br /> <br />Mark Osborn, PE Darin Hyatt, PE <br />Geotechnical Project Engineer Senior Geotechnical Engineer <br /> <br />Attachment <br /> <br /> <br />MWO/tw <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.