Laserfiche WebLink
Refer to attached Purpose and Need document. In summary, the purpose of this project is to improve the <br />mobility of this lane on eastbound TH 10 from the exit at I-35W to the exit at TH 96 and address the safety of <br />local traffic access onto eastbound TH 10. <br /> <br />Project Description <br />The Preferred Alternative will construct a two-lane exit on eastbound U.S. 10 beginning at southbound I- <br />35W onto eastbound U.S. 10 by adding a second exit lane left of the existing exit lane. An auxiliary lane <br />will be constructed on eastbound U.S. 10 from the County Road 10 entrance ramp to the exit onto County <br />Road 96, in Ramsey County, in the city of Arden Hills, Minnesota. The project will reconfigure the right in/right <br />out entrance to Prior Avenue to improve safety of the entrance. The project includes constructing a water <br />quality pond and noise barriers. The final determination on whether noise barriers are installed will occur via a <br />vote from the benefited receptors scheduled for Oct. 13, 2017 to Nov. 17, 2017. <br /> <br />Planned Project Schedule <br />The project is fully funded. The schedule is: <br />• Spring 2018: Assuming the noise wall is approved, the utilities will begin relocating utilities along the <br />frontage road including tree removal. If the noise wall is not approved, then this utility relocation and <br />tree removal will not occur. <br />• August 24, 2018: Project Letting. <br />• Fall 2018: Contractor may choose to do noise wall work and some work on the auxiliary lane on US 10 in <br />Fall 2018. However, this is not required and the Contractor may wait until Spring 2019 to start work. <br />• April 2019: Major construction begins with major lane and ramp restrictions and major traffic impacts. <br />• November 2019: Construction is completed. <br /> <br />I35W North MNPASS Coordination <br />SP 6205-39 is being coordinated with SP 6284-180 I35W North MNPASS. The closure of the I35W southbound <br />exit ramp to eastbound US 10 on the SP 6205-39 project will match the traffic control plans of the Contractor <br />working on SP 6284-180. The SP 6284-180 project will have a set of rules explaining when ramp A is closed then <br />ramp B must be open. In this case, when the I35W southbound exit to eastbound US 10 is closed, then the <br />southbound ramp to CR H, and the southbound to eastbound ramp at I35W and I694 must be open. <br /> <br />City’s Estimated Project Costs <br />At this time, the City does not have any cost participation in this project. There are no signals being <br />reconstructed, and the City has not asked to add any work such as additional local street reconstruction or utility <br />work. <br /> <br />City’s Maintenance Responsibilities <br />At this time there are no new City maintenance responsibilities. We are not adding new trails or bridges. <br /> <br />Please feel free to contact me if you have any questions about this submittal. <br /> <br />Sincerely, <br />