My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
09-11-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2017 4:08:55 PM
Creation date
9/7/2017 4:06:28 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 1 of 2 <br /> <br />DATE: September 11, 2017 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />William S. Joynes, Sr., City Administrator <br /> <br />FROM: Sue Polka, Public Works Director/City Engineer <br /> <br />SUBJECT: 2017 Trail and Watermain Projects – Review Trail/Watermain Projects and <br />Approve Engineering Services <br /> <br /> <br />Requested Action <br />Authorize final design of trail and watermain projects for the CR E2 Trail, the Old Snelling Trail <br />from Bethel Drive to CR E2 and the Old Snelling Water Main Improvement Project (City Project <br />No. 17-W-001) and approve the scope and fee from WSB & Associates (Attachment B) in the <br />amount of $77,644.00 for final design services and bidding services for the projects. <br /> <br />Background/Discussion <br />At the March 13, 2017 City Council meeting, Council authorized WSB to provide preliminary <br />design for the CR E2 Trail, the Old Snelling Trail from Bethel Drive to CR E2 and the Old <br />Snelling Water Main Improvement Project and final design services for the Old Snelling Trail <br />from CR E to Bethel Trail and CR E from freeway Park to Snelling Avenue N. The alignments <br />for the trails and watermain are shown on Attachment A. <br /> <br />WSB and staff met with Ramsey County to discuss the placement of the trails adjacent to the <br />respective county roads due to constraints caused by wetlands/waterbodies. The majority of the <br />trail along Old Snelling Road utilizes the existing shoulder. Curb and gutter will be added <br />between the trail and the driving lane. A retaining wall will be needed between McCracken Lane <br />and CR E2 due to wetlands and slopes in that area. The CR E2 trail is also proposed in a similar <br />manner on the existing paved shoulder with curb and gutter. This design provides substantial <br />savings from the original cost estimate the cost estimate as no retaining wall will be required. <br /> <br />Additional water main replacement is proposed on CR E2 due to a recent water main break <br />adjacent to Valentine Hills Elementary School. <br /> <br /> <br /> <br />NEW BUSINESS – 8A <br /> <br />MEMORANDUM <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.