Laserfiche WebLink
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2018 2022thru Department Street Department <br /> Description <br />The existing roadway has a minimal storm water management system in place. Records indicate that Snelling Avenue was crack sealed and seal <br />coated in 1996. City staff will televise the utility lines to determine the extent of any necessary repairs. <br />A preliminary Scoping Document was prepared in December 2010. Several options for reconstruction were discussed. No major sanitary sewer or <br />water problems were identified. <br />There is a bridge at the south end that will need to be replaced at the same time. Final bridge plans have been completed and are submitted to <br />MnDOT requesting Bridge Bonding funds <br />Snelling Ave (Co Rd E - TH51) <br />Estimated Residential Equivalent Units: 24 <br />2005 AADT: 1650 <br />2009 AADT: 950 <br />Bridge Bonding request submitted July of 2015. <br />Cummings Lane and Hamline Ave. north of Co. Rd. E could be added to this project for reclaiming of the road surface. <br />Project #17-Str-004 <br />Priority 3 Important <br /> Justification <br />Records indicate Snelling Avenue was crack sealed and seal coated in 1996. The existing roadway currently has a minimal storm water <br />management system in place. <br />Snelling from TH51 to Co Rd E, 2005 PCI = 34, 2008 PCI = 31 <br />Utilities <br />Watermain - no history of problems <br />Sanitary Sewer - no history of problems, install chimney seals on all manholes; correct any I&I deficiencies. <br />Storm Sewer - project must meet Rice Creek Watershed District requirements; improvements will improve water quality to Lake Johanna. <br />In order to better understand the project costs for this road segment, staff completed a field survey and some preliminary analysis for this project in <br />2010. Results of the survey and knowledge of existing conditions will assist in determining potential rehabilitation measures and associated <br />construction cost estimates. The level of improvement will determine the storm water requirements. <br />Useful Life 20-25 <br />Project Name Old Snelling Ave PMP w/ Bridge Reconstruction Category Streets: Reconstruction <br />Type Improvement <br />TCAAP No <br />Total Project Cost:$1,750,000 <br />Total20182019202020212022Expenditures <br />1,750,0001,750,000Construction/Maintenance <br />1,750,000 1,750,000Total <br />Total20182019202020212022Funding Sources <br />1,700,0001,700,000Capital Improvement Funds <br />(PIR) <br />50,00050,000Surface Water Mgmt Utility <br />Funds <br />1,750,000 1,750,000Total <br />Wednesday, September 13, 2017Page 16Produced Using the Plan-It Capital Planning Software