Laserfiche WebLink
<br />4.3. The County will pay costs included in the column labeled ‘Non-Participating/Arden <br />Hills/City Utilities’. The County plans to recover these costs from the developer at <br />the time that the Thumb portion of the TCAAP Redevelopment Site is developed. <br /> <br />4.4. The City will pay 50% of the cost of the sidewalk/trail as shown in Exhibit A. <br /> <br />4.5. The City will pay 100% of the cost of the conduit and handholes for future fiber <br />optic as the City requested the conduit be installed with the Project. <br /> <br />4.6. Design Engineering Costs <br /> <br />4.6.1. The City shall pay the County a design engineering fee equal to 12% of the <br />City’s share of the project items identified in Exhibit A and those revisions <br />requested by City. <br /> <br />4.6.2. Design engineering fees shall be calculated based on the quantities and unit <br />prices at the time of contract award. <br /> <br />4.7. Construction Engineering and Administration Costs <br /> <br />4.7.1. The City shall pay the County a construction engineering fee equal to 12% <br />of the City’s share of the project items identified in Exhibit A and any revisions <br />requested by City. <br /> <br />4.7.2. Construction engineering and administration fees shall be calculated based <br />on the final contract quantities and unit prices. <br /> <br />5. Payment Schedule <br /> <br />5.1. Design engineering will be invoiced at the time of contract award. <br /> <br />5.2. The County will invoice the City for construction costs incurred on a monthly basis <br />or as determined by the payment schedule for the contractor. <br /> <br />5.3. Construction engineering will be invoiced at the time of substantial project <br />completion, as determined by the County. <br /> <br />5.4. Payment will be made within 30 days of receipt of an invoice. <br /> <br />6. Ownership and Maintenance Responsibility for Project Elements <br /> <br />6.1. The County will own and maintain the roadway and associated roadway elements, <br />except as detailed below. <br /> <br />6.2. The County shall own and maintain all of the components of the stormsewer <br />system including catch basins, catch basin leads, and BMPs. <br />