Laserfiche WebLink
Page 1 of 1 <br /> <br /> <br />CONSENT ITEM – 6F <br /> MEMORANDUM <br /> <br /> <br />DATE: September 25, 2017 <br /> <br />TO: Honorable Mayor and City Councilmembers <br /> William S. Joynes, Sr., City Administrator <br /> <br />FROM: Sue Polka, Public Works Director/ City Engineer <br /> <br />SUBJECT: Hazelnut Park Playground Concrete Work <br /> <br /> <br /> <br />Requested Action <br /> <br />Authorize the purchase and installation of concrete curb and sidewalk for the Hazelnut Park <br />playground from Norsk Concrete Construction, Inc. in the amount of $11,840.00. <br /> <br />Background <br /> <br />The existing play structure at Hazelnut Park was installed in the summer of 1997. The play <br />structure is a steel structure that is showing signs of wear. The wood surrounding the structure is <br />in poor condition and the steel is rusting. The 2016 Capital Improvement Program (CIP) <br />identified the play structure replacement in 2016. Council approved the purchase and installation <br />of the new play structure at the April 20, 2017 Council meeting. <br /> <br />Public Works staff has removed the old equipment and is grading the site to bring it in <br />compliance with current accessibility standards. Staff has received a quote to install the ribbon <br />curbing around the play area and swing set area (Attachment A). <br /> <br />Discussion <br /> <br />A quote was received from Norsk Concrete Construction, Inc. in the amount of $11,840.00 <br />(Attachment B). <br /> <br />Attachments <br /> <br />A – Perry Park Playground Area Layout <br />B – Quote from Norsk Concrete Construction, Inc.