My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
09-25-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2017 11:54:32 AM
Creation date
9/22/2017 11:32:54 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Feasibility Report <br />Pavement Management Program <br />2018 Street and Utility Improvement Project <br />City of Arden Hills Project No. 18-STR-065 <br />WSB Project No. R-010111-000 Page 3 <br />2. PAVEMENT MANAGEMENT PROGRAM <br /> <br />2.1 Introduction <br /> <br /> 2.1.1 Authorization <br /> <br />On April 24, 2017, the Arden Hills City Council authorized the preparation of an <br />engineering feasibility report for the 2018 Street and Utility Improvement Project. This <br />project is included in the City’s PMP. <br /> <br /> 2.1.2 Scope <br /> <br />This report investigates the feasibility of proposed improvements to streets and utilities <br />identified within the City’s Capital Improvement Plan and PMP. Streets proposed for the <br />2018 Street and Utility Improvement Project were initially considered because of existing <br />pavement conditions and known utility failures. The streets proposed for improvements <br />include: <br /> <br />▪ Indian Oaks Court between James Avenue and the cul-de-sac <br />▪ Indian Oaks Trail between Hamline Avenue North and the cul-de-sac <br />▪ West Floral Drive between Hamline Avenue North and the dead end <br />▪ James Circle between West Floral Drive and the cul-de-sac <br />▪ Gale Circle between West Floral Drive and the cul-de-sac <br />▪ Norma Circle between West Floral Drive and the cul-de-sac <br />▪ Wedgewood Drive between Old S.T.H. 10 and the cul-de-sac <br />▪ Brueberry Lane between Old S.T.H. 10 and Parkshore Drive <br />▪ Parkshore Drive between Old S.T.H. 10 and the cul-de-sac <br /> <br />The project area is shown in Figure 1 of Appendix A. <br /> <br />Improvements within this report include roadway reconstruction, sanitary sewer repairs, <br />water main repairs, and drainage and storm sewer improvements. <br /> <br /> 2.1.3 Data Available <br /> <br /> Information and materials used in the preparation of this report include the following: <br /> <br />▪ City of Arden Hills 2030 Comprehensive Plan and CIP <br />▪ City of Arden Hills Record Plans <br />▪ Public Works Maintenance Records <br />▪ Private Utility Maps <br />▪ Utility Record Drawings <br />▪ Field Observations of the Area <br />▪ Field Survey <br />▪ Televising Reports of the Sanitary Sewer System, City of Arden Hills dated April <br />through June of 2017 <br />▪ Geotechnical Evaluation Report, WSB & Associates dated August 2017
The URL can be used to link to this page
Your browser does not support the video tag.