Laserfiche WebLink
Subd. 2 Submission of a completed permit application form, including all required <br />attachments, and scaled drawings showing the location and area of the proposed project and the <br />location of all known existing and proposed facilities. <br />Subd. 3 Payment of money due the City for: <br />A. Permit fees, estimated restoration costs and other management costs; <br />B. Prior obstructions or excavations; <br />C. Any undisputed loss, damage, or expense suffered by the City because of applicant's <br />prior excavations or obstructions of the rights -of -way or any emergency actions taken by the <br />City; <br />D. Franchise fees or other charges, if applicable. <br />Subd. 4 Payment of disputed amounts due the City by posting security or depositing in an <br />escrow account an amount equal to at least 110% of the amount owing. <br />Subd. 5 Posting an additional or larger construction performance bond for additional facilities <br />when applicant requests an excavation permit to install additional facilities and the City deems <br />the existing construction performance bond inadequate under applicable standards. <br />0360.10 Issuance of Permit; Conditions. <br />Subd. 1 Permit Issuance. If the applicant has satisfied the requirements of this section and <br />other applicable Code provisions and state and federal laws, the City shall issue a permit unless it <br />determines that denial is necessary to protect the health, safety and welfare or to protect the <br />right-of-way and its current use. <br />Subd. 2 Conditions. The City may impose reasonable conditions upon the issuance of the <br />permit and the performance of the applicant thereunder to protect the health, safety and welfare <br />or when necessary to protect the right-of-way and its current use. <br />360.11 Permit Fees. <br />Subd. 1 Excavation Permit Fee. The City shall establish, by Ordinance adopted by the <br />Council, an excavation permit fee in an amount sufficient to recover the following costs: <br />A. The City management costs; <br />B. Degradation costs, if applicable. <br />Subd. 2 Obstruction Permit Fee. The City shall establish, by Ordinance adopted by the <br />Council, the obstruction permit fee and shall be in an amount sufficient to recover the City <br />management costs. <br />Subd. 2a Small Wireless Facility, Support Structure, Collocation Fees. The City shall <br />establish, by Ordinance adopted by the Council and consistent with state law, Wireless permit <br />fees in an amount sufficient to recover the City management costs, or in the absence of a fee set <br />by Ordinance, the fees as authorized and established by law, and specifically by M.S. 237.163, as <br />amended from time to time. <br />1933610 <br />