Laserfiche WebLink
also be required to obtain a conditional use permit under this Code if the siting is proposed in a <br />district zoned for single-family residential use or within a historic district so designated at the <br />time of application. <br />Subd. 2 Prohibited Work. Except in an emergency, and with the approval of the City, no <br />right-of-way obstruction or excavation may be done when seasonally prohibited or when <br />conditions are unreasonable for such work. <br />Subd. 3 Interference with Right -of -Way. A permittee shall not so obstruct a right-of-way that <br />the natural free and clear passage of water through the gutters or other waterways shall be <br />interfered with. Private vehicles of those doing work in the right-of-way may not be parked <br />within or next to a permit area, unless parked in conformance with City parking regulations. The <br />loading or unloading of trucks must be done solely within the defined permit area unless <br />specifically authorized by the permit. <br />Q 360.16 Denial of Permit. <br />The City may deny a permit for failure to meet the requirements and conditions of state or <br />federal law, this section or other provisions of City Code, or if the City determines that the denial <br />is necessary to protect the health, safety, and welfare or when necessary to protect the right-of- <br />way and its current use. The City shall notify the telecommunications right-of-way user in <br />writing within three business days of the decision to deny and the basis for the denial. The <br />applicant may cure the deficiencies identified by the City and resubmit its application. If the <br />applicant resubmits the application within 30 days of receiving written notice of the denial, it <br />shall not be charged an additional filing or processing fee. The City shall approve or deny the <br />revised application within 30 days after the revised application is submitted. <br />0360.17 Installation Requirements. <br />The excavation, backfilling, patching and restoration, and all other work performed in the <br />right-of-way shall be done in conformance with Minnesota Rules 7819.1100 and 7819.5000 and <br />other applicable local requirements, in so far as they are not inconsistent with the M.S. <br />§§ 237.162 and 237.163, as amended from time to time. <br />i 360.18 Inspection. <br />Subd. 1 Notice of Completion. When the work under any permit hereunder is completed, the <br />permittee shall furnish a completion certificate in accordance Minnesota Rule 7819.1300. <br />Subd. 2 Site Inspection. The permittee shall make the work -site available to the City and to <br />all others as authorized by law for inspection at all reasonable times during the execution of and <br />upon completion of the work. <br />Subd. 3 Cessation/Corrective Orders. <br />A. At the time of inspection the director may order the immediate cessation of any work <br />which poses a serious threat to the life, health, safety or well-being of the public. <br />B. The City may issue an order to the permittee for any work which does not conform to <br />the terms of the permit or other applicable standards, conditions or codes. The order shall state <br />193361v6 <br />