My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-16-17-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
10-16-17-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 4:16:22 PM
Creation date
10/12/2017 4:15:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />Dave Perrault September 25, 2017 <br />Interim Finance Director <br />City of Arden Hills <br />1245 Highway 96 W <br />Arden Hills, MN 55113 <br /> <br />Re: Proposal for Utility Rate Study and Development Fee Analysis <br /> <br />Dear Mr. Perrault: <br /> <br />On behalf of Ehlers, I am pleased to present this proposal to provide financial planning services to <br />the City of Arden Hills. Our experience in public finance, utility rate consulting, and redevelopment <br />brings the necessary skills and perspectives to deliver the highest quality services. Ehlers proposes <br />to complete a Development Fee Analysis for TCAAP and a City-wide Utility Rate Study for each <br />utility fund. <br /> <br />Project Understanding <br />The purpose of the proposed Development Fee Analysis and Utility Rate Study will be to (i) develop <br />comprehensive fee structures for Council consideration that will assure development in TCAAP will <br />cover 100% of the costs of a new water tower, lift station and water booster station , (ii) review <br />existing utility rates and charges to assure there is adequate revenue to address long -term repair, <br />replacement and operational costs of the existing sy stem, along with appropriate reserves, if TCAAP <br />is never developed and (iii) show what affect development within TCAAP will have on long -term <br />user rates if/when developed . <br /> <br />The proposed Analysis is a long -term financial planning tool to design and project future utility rates <br />that meet the needs of the City. This includes encompassing the need for capital improvements, <br />changes in operating expenses, and impacts of existing debt and proposed debt. For the new water <br />tower, lift station and booster station, it is anticipated that the City will impose area charges that will <br />be paid when the land is platted for the various developments. <br /> <br />Proposed Scope of Work <br />The Development Fee Analysis and Utility Rate Study will be conducted in the <br />following steps. <br /> <br />Step 1: Complete a Review of the TCAAP Master Plan <br />The Development Fee Analysis will be based on the amount, type, and timing of development <br />specified in the Master Plan. <br /> <br />Step 2: Complete a Review of the TCAAP Capital Improvement Plan <br />We will work with the City staff and engineers to refine the total cost s based upon the approved <br />Master Plan. Furthermore, we will obtain a breakdown of the total costs into different components <br />of the system. For example, for the sanitary sewer utility, we will work with the eng ineers to break <br />out the costs and timing of lift stations, trunk lines, and laterals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.