My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-17-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2017
>
10-23-17-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2017 2:32:47 PM
Creation date
10/20/2017 2:24:46 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />194483v5 <br />building and the redevelopment of the Property for a Marriott Springhill Suites hotel (the <br />“Project”). <br /> C. The Project is illustrated and described on the following documents (“Plans”), <br />attached and incorporated as part of Planning Case 17-023, on file and of record at the City of <br />Arden Hills: <br />1. Title Sheet (C1.01) dated 09/12/17 <br />2. ALTA/ACSM Land Title Survey (C2.01) dated 08/07/17 <br />3. Existing Conditions – Demolition Plan (C2.02) dated 09/12/17 <br />4. Site Plan (C3.01) dated 09/12/17 <br />5. Truck Turning Movement (C3.02) dated 09/12/17 <br />6. Grading Plan (C4.01) dated 09/12/17 <br />7. Phase I Erosion Control Plan (C5.01) dated 09/12/17 <br />8. Phase II Erosion Control Plan (C5.02) dated 09/12/17 <br />9. Erosion Control Notes & Details (C5.03) dated 09/12/17 <br />10. SWPPP Narrative (C5.04 and C5.05) dated 09/12/17 <br />11. Utility Plan (C6.01) dated 09/12/17 <br />12. Details (C9.01 and C9.02) dated 09/12/17 <br />13. Landscape Plan (L1.01) dated 09/12/17 <br />14. Landscape Details – Notes (L1.02) dated 09/12/17 <br />15. Preliminary Stormwater Management Plan for Marriott Springhill Suites <br />Hotel, dated 08/18/17 as revised on 09/12/17 <br />16. Site Lighting, General Notes, and Abbreviations (SL001) dated 08/23/17 <br />17. Site Lighting Details (SL101) dated 08/23/17 <br />18. Site Photometric Plan (SL200A) dated 08/23/17 <br />19. Site Lighting Plan (SL200B) dated 08/23/17 <br />20. Rendering dated 08/24/17 <br />21. 1st Floor Plan dated 08/24/17 <br />22. Typical Floor Plan (2nd to 5th) dated 08/24/17 <br />23. Elevations (1) dated 08/24/17 <br />24. Elevations (2) dated 08/24/17 <br />25. Signage Plan dated 08/24/17 <br />26. Signage 01 dated 08/24/17 <br />27. Signage 02 dated 08/24/17 <br />28. Signage 03 dated 08/24/17 <br />29. Signage 04 dated 08/24/17 <br />30. Signage 05 dated 08/24/17 <br /> <br />2. CITY PLANNING COMMISSION REVIEW AND RECOMMENDATIONS. On <br />the 6th day of September, 2017, the City Planning Commission reviewed the Application, and
The URL can be used to link to this page
Your browser does not support the video tag.