My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-21-17-PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2017
>
11-21-17-PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2017 10:36:27 AM
Creation date
11/17/2017 10:36:12 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> MEMORANDUM <br /> <br />DATE: November 21, 2017 <br /> <br />TO: Parks Trails and Recreation Committee <br /> <br />FROM: Sara Knoll, Parks and Recreation Coordinator <br /> <br />SUBJECT: 2017 Johanna Marsh Playground Equipment Update <br /> <br /> <br />Background <br /> <br />The PTRC Committee and staff reviewed the comments that were submitted from the residents <br />of the Johanna Marsh neighborhood WSB provided the PTRC Committee with some concept <br />drawings of optional viewing areas for Johanna Marsh. Plans were reviewed by the PTRC <br />Committee and a concept design was chosen as the top choice. Due to the cost of the project the <br />City Council and City Staff have decided to move forward with the play structure only at this <br />time. The playground equipment was ordered through Minnesota/Wisconsin playgrounds and <br />the City of Arden Hills received a grant for $31,786.00 to help with the cost. <br /> <br />The playground equipment that was purchased is scheduled to be installed this spring. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.