My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-2017 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2017
>
08-09-2017 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2017 11:02:39 AM
Creation date
11/17/2017 10:59:47 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – July 5 , 2017 3 <br /> <br />4. Monument stakes shall be installed to demarcate the property line between Parcel A and <br />Parcel B. <br />5. A Building Permit shall be required for the new dwelling on Parcel B. <br />6. A Tree Preservation Plan shall be required as part of the Building Permit application for <br />the new dwelling on Parcel B. <br />7. Any extension of City services for Parcel B shall subject to approval by the City Engineer <br />and all associated costs shall be the responsibility of the applicant. <br /> <br />Senior Planner Bachler reviewed the options available to the Planning Commission on this <br />matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted. <br />3. Recommend Denial <br />4. Table <br /> <br />Senior Planner Bachler noted that the applicant would not be developing Parcel B and does not <br />have a buyer for the property yet. He recommended that Condition 3 be modified to: the park <br />dedication fee of $6,500 shall be due at the time of Building Permit application. <br /> <br />Chair Thompson opened the floor to Commissioner comments. <br /> <br />Commissioner Lambeth asked if the park dedication fee would be the responsibility of the <br />applicant. <br /> <br />Senior Planner Bachler stated this fee would not be the applicant’s responsibility, but rather the <br />developer of Parcel B. <br /> <br />Commissioner Lambeth questioned if existing trees and shrubbery along Amble Road was <br />included in the City’s calculations. <br /> <br />Senior Planner Bachler reported the landscape lot area requirement was calculated based on the <br />area of the private property, excluding the land within the public right-of-way. <br /> <br />Chair Thompson opened the public hearing at 6:41 p.m. <br /> <br />Chair Thompson invited anyone for or against the application to come forward and make <br />comment. <br /> <br />Dawn Shifsky, trustee for the property, commented on Condition 3 and stated staff did not <br />disclose the park dedication fee to her when she made application. She requested the park <br />dedication fee be waived or reduced. She added that she would not be able to meet Conditions 5 <br />through 7 as this would be left up to the developer. <br /> <br />There being no additional comment Chair Thompson closed the public hearing at 6:45 p.m. <br /> <br />Senior Planner Bachler explained Conditions 5 through 7 were related to the future <br />development of Parcel B. He reported these conditions were standard conditions for Minor
The URL can be used to link to this page
Your browser does not support the video tag.