My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-08-2017 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2017
>
11-08-2017 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2017 11:25:17 AM
Creation date
11/17/2017 11:15:06 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills – 20430 Comprehensive Plan <br /> <br /> <br />Approved: September 28, 201809 Amended: December 12, 2016 <br />6-9 <br />part of the 2005 pavement management program, the road that connected Red Fox <br />Road to Grey Fox Road was vacated, which reduced the amount of area used for right- <br />of-way. Fernwood Avenue on the Boston Scientific (formerly Guidant) campus was <br />vacated while Cummings Drive was dedicated to the City. <br /> <br />The land uses on the TCAAP property were the most notable differences from what was <br />expected in the 1998 future land uses to the actual land uses in 2008. Since 1998, the <br />number of acres that were anticipated to be part of the TCAAP redevelopment has been <br />reduced and, moreover, the redevelopment was delayed. Much of the TCAAP <br />redevelopment is anticipated to occur in phases over the next 10 to 20 years depending <br />on market conditions. <br /> <br />Finally, of the 131 acres of vacant land in 2008, approximately 70 acres are zoned for <br />residential, 40 acres are zoned commercial, and 21 acres are light industrial. The <br />vacant areas have not significantly changed anticipated land use types between the <br />1998 and 2030 future land use maps. The vacant land does not include the TCAAP <br />property, which is currently classified as public/institutional land since it is owned by the <br />federal government. <br /> <br />6.4 FUTURE LAND USE - 20430 <br /> <br />While redevelopment may occur on some parcels throughout the City, no significant <br />land use changes in the developed areas of Arden Hills are anticipated (Figure 6.3). <br />Most of the City’s projected population, household, and employment growth will occur <br />on the TCAAP redevelopment site. <br /> <br />Table 6.4 3 – 20430 Future Land Use <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Acres Land Use (TCAAP)Acres <br />27 Neighborhood Residential (TCAAP)*146 <br />946 Town Center (TCAAP)*16 <br />145 Campus Commercial (TCAAP)*40 <br />14 Office Mixed Use (TCAAP)*20 <br />10 Retail Mixed Use (TCAAP)*34 <br />33 Flex Business (TCAAP)*42 <br />26 Public & Institutional (Civic - TCAAP)2 <br />100 Parks and Open Space (TCAAP)24 <br />346 Utilities (Water Infrastructure - TCAAP)46 <br />461 Right-of-way (TCAAP)51 <br />20 <br />579 <br />1,327 <br />1,253 <br />35 <br />73 <br />5,427 Total** (TCAAP)427 <br />*Includes future right-of-way. <br />**May not equal 5,427 or 427 due to rounding. <br />Light Industrial and Office <br />Park and Open Space <br />Utilities <br />20430 Future Land Use <br />Low Density Residential <br />Medium Density Residential <br />High Density Residential <br />Mixed Business <br />Very Low Density Residential <br />Land Use (Not Including TCAAP) <br />Neighborhood Business <br />Water <br />Public & Institutional <br />Commercial <br />Community Mixed Use <br />Park Preserve <br />Total** (Not Including TCAAP) <br />Railroad Right-of-way <br />Right-of-way <br />Dr <br />a <br />f <br />t <br /> <br />11 <br />/ <br />0 <br />1 <br />/ <br />2 <br />0 <br />1 <br />7
The URL can be used to link to this page
Your browser does not support the video tag.