Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – November 8, 2017 3 <br /> <br />Senior Planner Bachler stated based on the submitted plans and findings of fact, staff <br />recommends approval of Planning Case 17-024 for a PUD Amendment at 1160 County Road E <br />West. If the Planning Commission votes to recommend approval of Planning Case 17-024, staff <br />is recommending the following seven (7) conditions of approval: <br /> <br />1. The project shall be completed in accordance with the submitted plans as amended by the <br />conditions of approval. Any significant changes to these plans, as determined by the City <br />Planner, shall require review and approval by the Planning Commission and the City <br />Council. <br />2. The Developer shall obtain the required development permits within one year of the <br />approval date or the approval shall expire, unless extended by the City Council prior to <br />the approval’s expiration date. Extension requests must be submitted in writing to the <br />City at least 45 days prior to the expiration date. <br />3. A PUD Amendment Agreement shall be prepared by the City Attorney and subject to <br />City Council approval. The Agreement shall be executed prior to the issuance of any <br />development permits. <br />4. Final grading, drainage, utility, and site plans shall be subject to approval by the City <br />Engineer, Building Official, City Planner, and Fire Marshall prior to the issuance of a <br />Grading and Erosion Control Permit or other development permits. <br />5. A Sign Permit shall be required for each wall sign and the menu ordering board. <br />6. The relocated parking lot island shall be replanted to include a minimum of one (1) tree. <br />7. The Developer shall provide a total of 8.5 caliper inches of new tree plantings on the site. <br />Senior Planner Bachler reviewed the options available to the Planning Commission on this <br />matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted. <br />3. Recommend Denial <br />4. Table <br /> <br />Vice Chair Jones opened the floor to Commissioner comments. <br /> <br />Commissioner Bartel expressed concern with the location of the drive-thru. He asked if an <br />easement would be needed for the drive-thru given its proposed location. <br /> <br />Senior Planner Bachler stated there was an opening at the southwest corner of the site which <br />was a curb cut into Arden Plaza. He reported there was an agreement in place to allow for this <br />access. He commented further on how traffic would flow through the property and explained <br />that signs and pavement striping would be used to assist in directing traffic. <br /> <br />Vice Chair Jones asked where the main entrance to the American Red Cross building was <br />located. He requested further information on the location of the ADA stalls. <br /> <br />Senior Planner Bachler explained this entrance was on the north side of the building. He then <br />reviewed the location of the ADA stalls within the parking lot. <br /> <br />Andrew Commers, Arden Square representative, stated his family has owned Arden Square for <br />the past 30 years. He thanked staff for the thorough report on this matter. He commented on the