Laserfiche WebLink
City of Arden Hills – Indian Oaks Area Drainage Review <br />December 29, 2017 <br />Page 2 <br /> <br />K:\010111-000\Admin\Contract\03 Proposal - Additional Scope\010111-000 - Arden Hills PMP additional Scope - Final.docx <br /> Meetings with MNDOT (If proposed improvements increase rates to MNDOT right of way or  <br />alterations to MNDOT drainage systems are necessary) ‐ 12 Hrs  <br />  <br />Step 3:  Final Design and Permitting. Estimated Fee $16,500  <br />Included in Step 3:  <br /> Detailed Survey of Construction Areas ‐ 16 Hrs  <br /> Wetland Permitting ‐ 16 Hrs  <br /> Stormwater Permitting ‐ 24 Hrs  <br /> MNDOT Permitting (If Necessary) 10 Hrs  <br /> Final Design of Proposed Improvements 20 Hrs  <br /> Construction Document Preparation and Additions to PMP Plan Set ‐ 50 Hrs  <br /> Easement Acquisition Coordination with City (If Necessary) – TBD  <br />  <br />Total Estimated Fee if all steps are completed: $32,500  <br />  <br />Please let me know if you have any questions.  <br />  <br />Sincerely,  <br />  <br />WSB & Associates, Inc.  <br />  <br />  <br />  <br />Jim Stremel, PE  <br />Senior Project Manager  <br />  <br />  <br />  <br />  <br />City of Arden Hills:  <br />  <br />_______________________________  <br />Authorized signature  <br />  <br />_________________________________  <br />Title  <br />  <br />_________________________________  <br />Date  <br />  <br />