My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-16-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
01-16-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 4:15:42 PM
Creation date
1/11/2018 4:13:21 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Projects –Storm Water Fund <br />•Storm Water fund has sufficient cash to pay for projects. <br />33 <br />Projects Project <br />Number 2018 2019 2020 2021 2022 <br />EXISTING INFRASTRUCTURE PROJECTS <br />Storm Pond Maintenance 09-Storm-001 50,000 <br />Storm Water Inlet/Outlet Repairs 13-Storm-001 25,000 <br />Storm Water BMP Study/Construction 17-Storm-001 <br />Old Snelling Ave PMP w/ Bridge Reconstruction 17-Str-004 50,000 <br />Future PMP 18-Str-005 200,000 200,000 <br />Indian Oaks/Floral Dr PMP - 2018 PMP 18-Str-065 350,000 <br />Surface Water Project (Undetermined)18-Storm-001 200,000 <br />Actual CIP (2017 Dollars)2017 550,000 125,000 200,000 0 200,000 <br />Percent Inflation 3%3%3%3%3% <br />Inflated Project Costs 566,500 132,613 218,545 - 231,855 <br />Total Projects to be Bonded for:5-Year Term 0 0 0 0 0 <br />10-Year Term 0 0 0 0 0 <br />15-Year Term 0 0 0 0 0
The URL can be used to link to this page
Your browser does not support the video tag.