My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-16-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
01-16-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 4:15:42 PM
Creation date
1/11/2018 4:13:21 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Purpose of Study <br />1.Review rate structure and usage rates for Water, Sewer and <br />Storm Water <br />–Prepare base model for existing operations and capital requirements <br />–Once base model is approved, complete impact analysis of TCAAP <br />•Water Fund & Sewer Fund <br />•Biggest issue is paying for water tower that is needed today <br />–Review rates annually to determine if they need to be adjusted based <br />upon actual water usage and how TCAAP builds out <br />2.Eliminate standby fee and incorporate into rates or other charge <br />-Line item on each bill and used to pay for maintenance costs <br />associated with fire protection (i.e. hydrants, sprinkler systems, etc.) <br />3.Eliminate undeveloped surface water management fee <br />–Confusing and cumbersome to calculate, without generating a lot of <br />revenue (approximately $5,200/year) <br />3
The URL can be used to link to this page
Your browser does not support the video tag.