Laserfiche WebLink
PW 2017-21R Page 3 of 7 <br /> <br /> <br />4.1.1. The City will provide construction engineering for all watermain related <br />items. <br /> <br />4.2. The City shall perform or contract the performance of the construction engineering <br />for the watermain. <br /> <br /> <br />5. Project Costs <br /> <br />5.1. Except as provided herein, the County and City will participate in the costs of <br />construction in accordance with the Ramsey County Cost Participation Policy <br />and approved in the 2017 – 2022 Ramsey County Transportation Improvement <br />Plan. If there is a conflict between the Cost Participation Policy and this <br />Agreement, this Agreement will prevail. <br /> <br />5.2. A list of the construction pay items and percentages of City funding responsibility <br />as well as the total estimated City Project cost is attached as Exhibit A. Cost <br />Participation Based on Engineer’s Estimate). Quantities and unit prices in Exhibit <br />A are estimates. Actual costs shall be based on the contract unit prices and the <br />quantities constructed. <br /> <br />5.3. Design Engineering Costs <br /> <br />5.3.1. The City shall pay the County a design engineering fee equal to 12% of the <br />project items identified in Exhibit A, except for the traffic signal control system <br />and watermain. <br /> <br />5.3.2. The City shall pay the County a design engineering fee equal to 8% of the <br />traffic signal control system project items identified in Exhibit A. <br /> <br />5.3.3. Design engineering fees shall be calculated based on the quantities and unit <br />prices at the time of contract award. <br /> <br />5.4. Construction Engineering Administration Costs <br /> <br />5.4.1. The City shall pay the County a construction engineering administration fee <br />equal to 12% of items identified in Exhibit A, except for the traffic signal <br />control system and watermain <br /> <br />5.3.2. The City shall pay the County a construction engineering administration fee <br />equal to 8% of the traffic signal control system as identified Exhibit A. <br /> <br />5.4.2. Construction engineering administration fees shall be calculated based on <br />the final contract quantities and unit prices. <br /> <br />6. Payment Schedule from City to County