My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
02-20-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 2:24:49 PM
Creation date
2/15/2018 1:44:37 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1048
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />AGENDA ITEM – 1B <br /> <br />MEMORANDUM <br /> <br />DATE: February 20, 2018 <br /> <br />TO: Honorable Mayor and City Councilmembers <br /> David Perrault, City Administrator <br /> <br />FROM : Sue Polka, Public Works Director/ City Engineer <br /> <br />SUBJECT: Johanna Marsh Playground <br /> <br />Budgeted Amount: Actual Amount: Funding Source: <br /> $100,000 $139,311 Park Capital Equipment <br /> <br />Background/Discussion <br /> <br />The 2018 Capital Improvement Plan includes $100,000 for resurfacing the tennis court at <br />Johanna Marsh Park. A geotechnical investigation was completed in August of 2016 and it was <br />determined that the court needed to be reconstructed and due to the underlying soils, <br />reconstruction was cost prohibitive. <br /> <br />Staff held a neighborhood meeting with the Johanna Marsh residents and presented two <br />playground layouts as we ll as receiving input on park amenities. The playground concepts were <br />generally well received. Several residents expressed interest in a boardwalk and overlook area. <br />Initial estimates for a park with all of these amenities totaled more than $300,000. Based on <br />feedback from the September 2017 PTRC meeting, WSB developed the layout depicted in <br />Attachment A. The proposed layout includes playground areas, a small picnic shelter, and an <br />overlook with seating. The cost estimate for the park (not including the playground equipment) <br />is shown on Attachment B. <br /> <br />The total estimated cost is outlined in the following table: <br /> <br />ESTIMATED PARK CONSTRUCTION <br />Site work (Attachment B) $139,111 <br />Playground Equipment* $46,985 <br />Design & Construction Services $33,000 <br />TOTAL ESTIMATED COST $219,096 <br />*Approved and purchased in 2017
The URL can be used to link to this page
Your browser does not support the video tag.