My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
02-20-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 2:24:49 PM
Creation date
2/15/2018 1:44:37 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1048
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Comprehensive Water Plan <br />City of Arden Hills, MN <br />WSB Project No. 3455-20 PAGE 2 <br />INTRODUCTION <br />Purpose <br />This Comprehensive Water Supply Plan is a section of the City’s 2040 Comprehensive Plan. <br />The purpose of the Comprehensive Water Supply Plan is to provide an overview of the City’s <br />current drinking water resources, infrastructure, policies, and challenges, and to present future <br />plans. <br />This Comprehensive Water Supply Plan has been prepared according to the guidelines <br />established by the Metropolitan Council and the Minnesota Department of Natural Resources <br />(DNR) per Minnesota Statute 473.859, which requires that Water Supply Plans be completed by <br />all local units of government in the seven-county Metropolitan Area. The attached Water Supply <br />Plan conforms to the template provided by the DNR, while this Comprehensive Plan expands <br />upon the template and provides further information for City and Metropolitan Council planning. <br />Background <br />The City of Arden Hills, ten square miles in area, is located in Ramsey County to the north of the <br />Twin Cities. All of the properties within the City limits are currently serviced by the City’s water <br />distribution system which receives its water supply from the City of Roseville, which in turn <br />receives its supply from SPRWS. <br />This study uses population projections consistent with the MCES System Statement for the City <br />of Arden Hills. Historical data and projected water demands are used to estimate water demand <br />through the year 2040 and to evaluate the existing water distribution system with respect <br />tothose demands. The planned 2040 land use from the Land Use Plan was used to identify <br />specific areas of development and the associated improvements that will be required to serve <br />those areas. <br />Data Available <br />The following sources of information were used to prepare this report: <br /> Water Supply Plan for the City of Arden Hills, prepared by WSB & Associates, Inc. <br /> MCES System Statement for the City of Arden Hills <br /> MCES Community Profile for the City of Arden Hills <br /> Water usage data as reported by the City to the DNR’s Minnesota Permitting and <br />Reporting System (MPARS) <br /> <br />Dr <br />a <br />f <br />t <br /> <br />11 <br />/ <br />2 <br />0 <br />/ <br />2 <br />0 <br />1 <br />7
The URL can be used to link to this page
Your browser does not support the video tag.