My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
02-20-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 2:24:49 PM
Creation date
2/15/2018 1:44:37 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1048
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Water Supply Plan Template –July 8, 2016 <br /> <br />7 <br /> <br />• Upon implementation, contribute to maintaining aquifer levels, reducing potential well <br />interference and water use conflicts, and reducing the need to drill new wells or expand <br />system capacity. <br />• Enable DNR to compile and analyze water use and conservation data to help guide decisions. <br />• Conserve Minnesota’s water resources <br />If your community needs assistance completing the Water Supply Plan, assistance is available from your <br />area hydrologist or groundwater specialist, the MN Rural Waters Association circuit rider program, or in <br />the metropolitan area from Metropolitan Council staff. Many private consultants are also available. <br />WSP Approval Process <br />10 Basic Steps for completing a 10-Year Water Supply Plan <br />1. Download the DNR/Metropolitan Council Water Supply Plan Template <br />www.mndnr.gov/watersupplyplans <br />2. Save the document with a file name with this naming convention: <br />WSP_cityname_permitnumber_date.doc. <br />3. The template is a form that should be completed electronically. <br />4. Compile the required water use data (Part 1) and emergency procedures information (Part 2) <br />5. The Water Conservation section (Part 3) may need discussion with the water department, <br />council, or planning commission, if your community does not already have an active water <br />conservation program. <br />6. Communities in the seven-county Twin Cities metropolitan area should complete all the <br />information discussed in Part 4. The Metropolitan Council has additional guidance information <br />on their webpage http://www.metrocouncil.org/Handbook/Plan-Elements/Water- <br />Resources/Water-Supply.aspx. All out-state water suppliers do not need to complete the <br />content addressed in Part 4. <br />7. Use the Plan instructions and Checklist document to insure all data is complete and attachments <br />are included. This will allow for a quicker approval process. www.mndnr.gov/watersupplyplans <br />8. Plans should be submitted electronically – no paper documents are required. <br />https://webapps11.dnr.state.mn.us/mpars/public/authentication/login <br />9. DNR hydrologist will review plans (in cooperation with Metropolitan Council in Metro area) and <br />approve the plan or make recommendations. <br />10. Once approved, communities should complete a Certification of Adoption form, and send a copy <br />to the DNR. <br /> <br /> <br />Dr <br />a <br />f <br />t <br /> <br />11 <br />/ <br />2 <br />0 <br />/ <br />2 <br />0 <br />1 <br />7
The URL can be used to link to this page
Your browser does not support the video tag.