My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
02-20-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 2:24:49 PM
Creation date
2/15/2018 1:44:37 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1048
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 5 <br /> <br /> <br /> <br /> <br />Surface Water Management Plan Section 5: Goals and Policies <br />City of Arden Hills <br />WSB Project No. 3455-200 Page 3 <br />Table 5-2 MCM and BMPs Summary Sheets <br />Key to <br />Unique BMP <br />ID Numbers Required BMP Title <br />MCM 1: Public Education and Outreach <br />1a-1 Distribute Educational Materials <br />1b-1 Implement an Education Program <br />1c-1 Education Program: Public Education and Outreach <br />1c-2 Education Program: Public Participation <br />1c-3 Education Program: Illicit Discharge Detection and Elimination <br />1c-4 Education Program: Construction Site Run-off Control <br />1c-5 Education Program: Post-Construction Stormwater Management in <br />New Development and Redevelopment <br />1c-6 Education Program: Pollution Prevention/Good Housekeeping for <br />Municipal Operations <br />1d-1 Coordination of Education Program <br />1e-1 Annual Public Meeting <br />MCM 2: Public Participation & Involvement <br />2a-1 Comply with Public Notice Requirements <br />2b-1 Solicit Public Input and Opinion on the Adequacy of the SWPPP <br />2c-1 Consider Public Input <br />MCM 3: Illicit Discharge, Detection, and Elimination <br />3a-1 Storm Sewer System Map <br />3b-1 Regulatory Control Program <br />3c-1 Illicit Discharge Detection and Elimination Plan <br />3d-1 Public and Employee Illicit Discharge Information Program <br />3e-1 Identification of Non-Stormwater Discharges and Flows <br />MCM 4: Construction Site Runoff Control <br />4a-1 Ordinance or other Regulatory Mechanism <br />4b-1 Construction Site Inspection of Erosion and Sediment Control BMPs <br />4c-1 Waste Controls for Construction Site Operators <br />4d-1 Procedure for Site Plan Review <br />4e-1 Establishment of Procedures for the Receipt and Consideration of <br />Reports of Stormwater Noncompliance <br />4f-1 Establishment of Procedures for Site Inspections and Enforcement <br />MCM 5: Post-Construction Site Runoff Control <br />Dr <br />a <br />f <br />t <br /> <br />11 <br />/ <br />2 <br />0 <br />/ <br />2 <br />0 <br />1 <br />7
The URL can be used to link to this page
Your browser does not support the video tag.