Laserfiche WebLink
ARDEN HILLS CITY COUNCIL – FEBRUARY 12, 2018 5 <br /> <br />County Road F improvements. Two properties are proposed to be assessed for traffic signal and <br />intersection improvements – Land O’ Lakes and Boston Scientific. Staff has provided each <br />property owner with the Feasibility Report and has conducted several meetings with the affected <br />parties. The total project cost outlined in the feasibility report is approximately $200,000 lower <br />than the current estimate due to plan revisions between 60% design and final design. <br /> <br />Public Works Director/City Engineer Polka reported a portion of the City cost is proposed to <br />be assessed to the Land O’ Lakes and Boston Scientific properties. The assessment method laid <br />out in the Feasibility Report has 100% of the cost of the traffic signal evenly split between the two <br />properties, with the turn lanes associated with the Land O’ Lakes project being assessed to them <br />as well per their development agreement with the City. Staff anticipates further discussions <br />between and among the parties to revise and reach agreement on the final cost share allocation for <br />the traffic signal costs. <br /> <br />Public Works Director/City Engineer Polka commented the purpose of the Public Hearing is to <br />approve plans and specifications prepared by Ramsey County and to order the improvements as <br />required by Minnesota Statutes Chapter 429 for projects that include special assessments. <br /> <br />Mayor Grant clarified the plans and specifications for this project were drawn up by Ramsey <br />County. <br /> <br />Public Works Director/City Engineer Polka reported this was the case and noted the City’s <br />portion of the project would be bid out in separate line items. <br /> <br />Councilmember Holden stated the last time the County worked on County Road F there were <br />problems with the soil. She asked if enough borings have been completed to understand the soil <br />conditions. <br /> <br />Public Works Director/City Engineer Polka stated borings have been completed and this <br />should not be a concern. <br /> <br />Mayor Grant stated under the Public Hearing section, citizens would have an opportunity to <br />discuss ideas regarding the TCAAP development. <br /> <br />Mayor Grant opened the public hearing at 7:44 p.m. <br /> <br />With no one coming forward to speak, Mayor Grant closed the public hearing at 7:45 p.m. <br /> <br />MOTION: Councilmember Holden moved and Councilmember McClung seconded a <br />motion to adopt Resolution #2018-011 Ordering the Improvements and <br />Approving Plans and Specifications Prepared by Ramsey County Pursuant to <br />the Cooperative Agreement. <br /> <br />Councilmember Holden requested the signal timing at County Road F and Land O’Lakes be <br />adjusted to meet the traffic needs. <br /> <br />