My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
03-12-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2018 9:41:39 AM
Creation date
3/13/2018 9:31:12 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />196456v5 <br /> <br />time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan <br />and schedule or supplementary instructions received from the City, the City may take such action as it <br />deems appropriate to control erosion. The City will endeavor to notify the Developer in advance of any <br />proposed action, but failure of the City to do so will not affect the Developer's and City's rights or <br />obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such <br />work within ten (10) days, the City may draw down the letter of credit or escrow to pay any costs. No <br />development, street or utility construction will be allowed and no building permits will be issued unless the <br />plat is in full compliance with the approved erosion control plan. <br /> 11. GRADING PLAN. The plat shall be graded in accordance with the approved grading <br />development and erosion control plan. The plan shall conform to City of Arden Hills specifications. Within <br />thirty (30) days after completion of the grading the Developer shall provide the City with an "as <br />constructed" grading plan certified by a registered land surveyor or engineer. Notwithstanding the <br />foregoing, the City may issue building permits to the Developer, prior to completion of all grading, <br />provided the City Engineer has determined that adequate erosion control measures are in place. The "as <br />constructed" plan shall include field verified elevations of the following: a) cross sections of ponds; b) <br />location and elevations along all swales, wetlands, wetland mitigation areas if any, ditches, locations and <br />dimensions of borrow areas/stockpiles, and installed "conservation area" posts; and c) lot corner elevations. <br />The City will withhold issuance of building permits until the approved certified grading plan is on file with <br />the City and all erosion control measures are in place as determined by the City Engineer. <br /> 12. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from <br />construction work by the Developer, subcontractors, their agents or assigns. Prior to any construction in the <br />plat, the Developer shall identify in writing a responsible party and schedule for erosion control, street <br />cleaning, and street sweeping. <br /> 13. CLAIMS. In the event that the City receives claims from labor, material, or others that <br />work required by this Agreement has been performed, the sums due them have not been paid, and the <br />laborers, material, or others are seeking payment from the City, the Developer hereby authorizes the City to
The URL can be used to link to this page
Your browser does not support the video tag.