My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2018
>
02-12-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2018 10:48:46 AM
Creation date
3/13/2018 10:48:38 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—FEBRUARY 12, 2018 5 <br /> County Road F improvements. Two properties are proposed to be assessed for traffic signal and <br /> intersection improvements — Land 0' Lakes and Boston Scientific. Staff has provided each <br /> property owner with the Feasibility Report and has conducted several meetings with the affected <br /> parties. The total project cost outlined in the feasibility report is approximately $200,000 lower <br /> than the current estimate due to plan revisions between 60%design and final design. <br /> Public Works Director/City Engineer Polka reported a portion of the City cost is proposed to <br /> be assessed to the Land 0' Lakes and Boston Scientific properties. The assessment method laid <br /> out in the Feasibility Report has 100%of the cost of the traffic signal evenly split between the two <br /> properties, with the turn lanes associated with the Land 0' Lakes project being assessed to them <br /> as well per their development agreement with the City. Staff anticipates further discussions <br /> between and among the parties to revise and reach agreement on the final cost share allocation for <br /> the traffic signal costs. <br /> Public Works Director/City Engineer Polka commented the purpose of the Public Hearing is to <br /> approve plans and specifications prepared by Ramsey County and to order the improvements as <br /> required by Minnesota Statutes Chapter 429 for projects that include special assessments. <br /> Mayor Grant clarified the plans and specifications for this project were drawn up by Ramsey <br /> County. <br /> Public Works Director/City Engineer Polka reported this was the case and noted the City's <br /> portion of the project would be bid out in separate line items. <br /> Councilmember Holden stated the last time the County worked on County Road F there were <br /> problems with the soil. She asked if enough borings have been completed to understand the soil <br /> conditions. <br /> Public Works Director/City Engineer Polka stated borings have been completed and this <br /> should not be a concern. <br /> Mayor Grant stated under the Public Hearing section, citizens would have an opportunity to <br /> discuss ideas regarding the TCAAP development. <br /> Mayor Grant opened the public hearing at 7:44 p.m. <br /> With no one coming forward to speak, Mayor Grant closed the public hearing at 7:45 p.m. <br /> MOTION: Councilmember Holden moved and Councilmember McClung seconded a <br /> motion to adopt Resolution #2018-011 Ordering the Improvements and <br /> Approving Plans and Specifications Prepared by Ramsey County Pursuant to <br /> the Cooperative Agreement. <br /> Councilmember Holden requested the signal timing at County Road F and Land O'Lakes be <br /> adjusted to meet the traffic needs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.