My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-19-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
03-19-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 1:58:49 PM
Creation date
3/16/2018 1:13:14 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Projects –Storm Water Utility <br />•No changes to capital projects since last meeting <br />19 <br />Projects Project <br />Number 2018 2019 2020 2021 2022 <br />EXISTING INFRASTRUCTURE PROJECTS <br />Storm Pond Maintenance 09-Storm-001 50,000 <br />Storm Water Inlet/Outlet Repairs 13-Storm-001 25,000 <br />Storm Water BMP Study/Construction 17-Storm-001 <br />Old Snelling Ave PMP w/ Bridge Reconstruction 17-Str-004 50,000 <br />Future PMP 18-Str-005 200,000 200,000 <br />Indian Oaks/Floral Dr PMP - 2018 PMP 18-Str-065 555,000 <br />Surface Water Project (Undetermined)18-Storm-001 200,000 <br />Actual CIP (2018 Dollars)2018 755,000 125,000 200,000 0 200,000 <br />Percent Inflation 3%3%3%3%3% <br />Inflated Project Costs 755,000 128,750 212,180 - 225,102 <br />Total Projects to be Bonded for:5-Year Term 0 0 0 0 0 <br />10-Year Term 0 0 0 0 0 <br />15-Year Term 0 0 0 0 0
The URL can be used to link to this page
Your browser does not support the video tag.