My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
03-26-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 1:43:54 PM
Creation date
3/23/2018 3:56:43 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />196456v7 <br />or Lot 2, or the Developer shall be required to submit a cash escrow in the amount of $500.00 to <br />the City to ensure the removal of the deck within six (6) months from the approval of the Final <br />Plat. <br /> G. The Developer shall be required to stake metal markers along the drainage <br />easement abutting the stormwater basins and wetland with signs stating the area is a natural <br />vegetation/infiltration area and no dumping is allowed. The design of the signs shall be approved <br />by the City prior to installation. <br /> H. The Developer shall conform to all other City regulations. <br /> 18. RESPONSIBILITY FOR COSTS. <br /> A. Except as otherwise specified herein, the Developer shall pay all costs <br />incurred by it or the City in conjunction with the development of the plat, including but not limited <br />to Soil and Water Conservation District charges, legal, planning, engineering and inspection <br />expenses incurred in connection with approval and acceptance of the plat, the preparation of this <br />Agreement, review of construction plans and documents, and all costs and expenses incurred by <br />the City in monitoring and inspecting development of the plat. <br /> B. The Developer shall reimburse the City for reasonable costs incurred in the <br />enforcement of this Agreement, including engineering and attorneys' fees. <br /> C. The Developer shall pay, or cause to be paid when due, and in any event <br />before any penalty is attached, all special assessments referred to in this Agreement. This is an <br />obligation of the Developer and shall continue in full force and effect even if the Developer sells <br />one or more lots, the entire plat or property, or any part of it. <br /> D. The Developer shall pay in full all bills submitted to it by the City for <br />obligations incurred under this Agreement within thirty (30) days after receipt. If the bills are not <br />paid on time, the City may halt plat development and construction until the bills are paid in full.
The URL can be used to link to this page
Your browser does not support the video tag.