My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-09-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
04-09-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 3:20:28 PM
Creation date
4/5/2018 3:15:04 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL – MARCH 12, 2018 8 <br /> <br />permits. Copies of all issued permits shall be provided to the City prior to the issuance of <br />any development permits. <br />8. Final grading and drainage plans shall be subject to approval by the City Engineer prior to <br />the commencement of any construction on the site. <br />9. The signed and recorded Maintenance Agreement between the RCWD and the Developer <br />for the stormwater management facilities on the site shall be provided to the City before <br />the issuance of any development permits. The City shall not be responsible for the <br />maintenance of the onsite stormwater management facilities. <br />10. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br />preserved shall be visibly marked and city-approved tree protection fencing or other <br />method shall be installed and maintained at the critical root zones of the trees to be <br />protected. The location of the fencing shall be in conformance with the approved tree <br />preservation plan. <br />11. A Letter of Credit in the amount of 125 percent of the cost of materials and installation for <br />the required replacement tree plantings shall be provided prior to the issuance of a Grading <br />and Erosion Control permit. The Letter of Credit shall be valid for two full years from the <br />date of installation of the replacements trees. <br />12. The Developer shall work with the City to find alternative locations for the 30.9 caliper <br />inches of replacement trees off-site, or a fee in lieu of the replacement trees will be <br />required equaling the cost of materials and installation plus ten percent, as determined by <br />the City Council. <br />13. Survey monuments shall be placed and installed at all block corners, angle points, points <br />of curves in streets, and at intermediate points as shown on the Final Plat. Pipes or streel <br />rods shall be placed at the corners of each lot. <br />14. The Developer shall be required to stake metal markers along the drainage easement <br />abutting the infiltration basins and wetland with signs stating the area is a natural <br />vegetation/infiltration area and no dumping is allowed. The design of the signs shall be <br />approved by the City prior to installation. <br />15. Sewer and water for the subdivision shall be obtained by connections to the City water and <br />sewer systems. Extension of City services shall be subject to review and approval by the <br />City Engineer and all associated costs shall be the responsibility of the developer. <br />16. A grading as-built and utility as-built plan shall be provided to the City upon completion <br />of grading and utility work. <br />17. The deck on the existing single-family dwelling at 3685 New Brighton Road shall be <br />removed or modified in order to meet the side yard setback requirement and not encroach <br />on any drainage and utility easement prior to the issuance of a building permit for Lot 1 or <br />Lot 2, or the Developer shall be required to submit a cash escrow with the City to ensure <br />the removal of the deck within six (6) months from the approval of the Final Plat. <br />18. The driveway for the existing single-family dwelling at 3685 New Brighton Road shall be <br />relocated to Thom Drive prior to the issuance of a building permit for Lot 1 or Lot 2, or <br />the Developer shall be required to submit a cash escrow with the City to ensure the <br />relocation of the driveway within six (6) months from the approval of the Final Plat. <br />19. The Developer shall conform to all other City regulations. <br /> <br />Councilmember Holden asked what the previous deficiency was within the tree preservation <br />plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.