My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2018
>
03-12-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 6:59:51 AM
Creation date
4/10/2018 2:41:28 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—MARCH 12, 2018 8 <br /> permits. Copies of all issued permits shall be provided to the City prior to the issuance of <br /> any development permits. <br /> 8. Final grading and drainage plans shall be subject to approval by the City Engineer prior to <br /> the commencement of any construction on the site. <br /> 9. The signed and recorded Maintenance Agreement between the RCWD and the Developer <br /> for the stormwater management facilities on the site shall be provided to the City before <br /> the issuance of any development permits. The City shall not be responsible for the <br /> maintenance of the onsite stormwater management facilities. <br /> 10. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br /> preserved shall be visibly marked and city-approved tree protection fencing or other <br /> method shall be installed and maintained at the critical root zones of the trees to be <br /> protected. The location of the fencing shall be in conformance with the approved tree <br /> preservation plan. <br /> 11. A Letter of Credit in the amount of 125 percent of the cost of materials and installation for <br /> the required replacement tree plantings shall be provided prior to the issuance of a Grading <br /> and Erosion Control permit. The Letter of Credit shall be valid for two full years from the <br /> date of installation of the replacements trees. <br /> 12. The Developer shall work with the City to find alternative locations for the 30.9 caliper <br /> inches of replacement trees off-site, or a fee in lieu of the replacement trees will be <br /> required equaling the cost of materials and installation plus ten percent, as determined by <br /> the City Council. <br /> 13. Survey monuments shall be placed and installed at all block corners, angle points, points <br /> of curves in streets, and at intermediate points as shown on the Final Plat. Pipes or streel <br /> rods shall be placed at the corners of each lot. <br /> 14. The Developer shall be required to stake metal markers along the drainage easement <br /> abutting the infiltration basins and wetland with signs stating the area is a natural <br /> vegetation/infiltration area and no dumping is allowed. The design of the signs shall be <br /> approved by the City prior to installation. <br /> 15. Sewer and water for the subdivision shall be obtained by connections to the City water and <br /> sewer systems. Extension of City services shall be subject to review and approval by the <br /> City Engineer and all associated costs shall be the responsibility of the developer. <br /> 16. A grading as-built and utility as-built plan shall be provided to the City upon completion <br /> of grading and utility work. <br /> 17. The deck on the existing single-family dwelling at 3685 New Brighton Road shall be <br /> removed or modified in order to meet the side yard setback requirement and not encroach <br /> on any drainage and utility easement prior to the issuance of a building permit for Lot 1 or <br /> Lot 2, or the Developer shall be required to submit a cash escrow with the City to ensure <br /> the removal of the deck within six (6) months from the approval of the Final Plat. <br /> 18. The driveway for the existing single-family dwelling at 3685 New Brighton Road shall be <br /> relocated to Thom Drive prior to the issuance of a building permit for Lot 1 or Lot 2, or <br /> the Developer shall be required to submit a cash escrow with the City to ensure the <br /> relocation of the driveway within six (6) months from the approval of the Final Plat. <br /> 19. The Developer shall conform to all other City regulations. <br /> Councilmember Holden asked what the previous deficiency was within the tree preservation <br /> plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.