Laserfiche WebLink
<br />December 29, 2017 <br />Page 2 <br /> <br /> <br /> C:\Plots\Letter proposal.docx <br /> <br />the AM and PM peak hours. We will summarize and use the data to develop the concepts and <br />include in the ICE report. <br /> <br /> Task 2.3 Crash Data: WSB will utilize MnDOT’s CMAT website to collect and summarize crash <br />rates for the intersection. This information will be included in the ICE report. <br /> <br />Task 3: Preliminary Engineering: <br /> <br />Concept layouts will likely need to be created for a roundabout, signal and possibly all-way stop option. <br /> <br /> Task 3.1 Concept Layout: WSB will develop a layout that generally follows the MnDOT Geometric <br />Layout style. The layout will include roadway geometry, typical sections and insets for <br />intersection alternatives. <br /> <br /> Task 3.2 Traffic Modeling: WSB will analyze the intersection alternatives with Rodel software for <br />the roundabout alternative and Synchro software for the signal alternative. This data will be <br />summarized based on level of service. <br /> <br /> Task 3.3 Performance Checks: Roundabouts require performance checks such as fast path and <br />turning movements. WSB will provide the necessary design checks and ensure the concept is <br />within the MnDOT and FHWA thresholds. <br /> <br /> Task 3.4 Preliminary Right of Way Limits: WSB will establish preliminary right of way limits in <br />order for the County to get a sense of the future needs as the project progresses. It is assumed <br />the existing right of way alignment will be on-hand at WSB from previous projects, and no title <br />work will be needed. Acquiring title work would be considered an additional item beyond what is <br />contained in this proposal. <br /> <br /> Task 3.5 Cost Estimation: WSB will complete a preliminary cost estimate for the project upon <br />completion of the preliminary layout. <br /> <br />Task 4: ICE Report: <br /> <br />WSB will complete a final ICE report that can be submitted and approved by MnDOT. The report will <br />summarize the data completed in the previous tasks. <br /> <br />PROPOSED FEE <br />We propose to complete this project for the below proposed fee below: <br /> <br />Total Project Base Fee: ..................................................................... $35,642 <br /> <br />The attached detailed scope of work and associated fees are for your review. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />