My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
04-16-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 12:26:35 PM
Creation date
4/13/2018 12:25:03 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Projects Project <br />Number 2018 2019 2020 2021 2022 <br />EXISTING INFRASTRUCTURE & PROJECTS <br />Water Tower Repair & Repainting 12-W-001 520,000 <br />CR E2 Water Replacement/Old Hwy 10 Loop 17-W-001 1,050,000 <br />Booster Station Repair/Upgrade (Roseville)18-W-001 400,000 154,000 <br />County Road F Watermain Replacement 18-W-002 300,000 <br />Future PMP 18-Str-005 400,000 400,000 <br />Indian Oaks/Floral Dr PMP - 2018 PMP 18-Str-065 751,000 <br />Watermain Replacement 250,000 250,000 250,000 250,000 <br />Total Existing Infrastructure & Projects 3,021,000 404,000 650,000 250,000 650,000 <br />Actual CIP (2018 Dollars)2018 3,021,000 404,000 650,000 250,000 650,000 <br />Percent Inflation 3%3%3%3%3% <br />3,021,000 416,120 689,585 273,182 731,581 <br />Total Projects to be Bonded for:5-Year Term 0 0 0 0 0 <br />10-Year Term 2,500,000 0 0 0 0 <br />15-Year Term 0 0 0 0 0 <br />Water Utility –Updated CIP UPDATED <br />5 <br />•2018 Bonding Amount reduced to $2.5 million <br />•CR E2 project increased from $855,000 to $1,050,000 <br />•Bonding in future years’ eliminated
The URL can be used to link to this page
Your browser does not support the video tag.