My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-14-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
05-14-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 4:59:07 PM
Creation date
5/10/2018 4:56:42 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Fee Estimate <br />Arden Hills Date: 3/15/2018 <br />Watermain Relocation By:LPP <br />SR PM Proj. Engineer <br />Proj. <br />Designer/ <br />Inspector <br />Admin Tech <br />1 Project Coordination <br />1.1 Coordination with Arden Hills (2 Meetings plus preparation) 6 2 8 1,266$ <br />1.2 Project Administration 6 6 1,038$ <br />1.3 MnDOT Coordination (2 Meetings plus preparation) 6 2 8 1,266$ <br />1.4 MnDOT and MnDOH Permits 4 4 456$ <br />SUBTOTAL HOURS 18 8 - - 26 <br />SUBTOTAL COST 4,026$ <br />Expenses: <br />Travel & Subsistence (TS)52$ <br />Subtotal 4,078$ <br />2 Plan Preparation <br />2.1 Plan Preparation 2 16 60 78 7,210$ <br />2.2 Specifications 1 16 8 25 2,461$ <br />2.3 Develop Cost Estimate 1 4 5 450$ <br />2.4 As-Built Preparation 1 2 4 7 737$ <br />SUBTOTAL HOURS 4 35 68 8 115 <br />SUBTOTAL COST 10,858$ <br />Expenses: <br />Subtotal 10,858$ <br />TOTAL HOURS 22 43 68 8 141 <br />TOTAL LABOR COST 14,884$ <br />TOTAL EXPENSES 52$ <br />TOTAL PROJECT 14,936$ <br />TOTAL (ROUNDED)15,000$ <br />Total Dollars <br />Estimated Person Hours Required <br />Total <br />Hours <br />Project: <br />Client: <br />Task Task Description
The URL can be used to link to this page
Your browser does not support the video tag.