Laserfiche WebLink
Page 2 of 2 <br /> <br /> <br />STREET RECONSTRUCTION <br />Item Calculation Result <br />Half of Construction Cost $1,089,051.10/2 $544,525.55 <br />Add 37% Overhead $544,525.55 x 1.37 $746,000.00 <br />Divide by Assessable Units $746,000.00/73 $ 10,219.18 <br /> <br /> <br />STREET RECLAMATION <br />Item Calculation Result* <br />Half of Construction Cost $152,481.75/2 $ 76,240.88 <br />Add 37% Overhead $76,240.88 x 1.37 $104,450.00 <br />Divide by Assessable Units $104,450.00/57.5 $ 1,816.52 <br />*Please note that the townhouses equal 0.5 units and will be assessed at a rate of $908.26 <br /> <br />The full detailed assessment roll is attached as Exhibit B. <br /> <br /> <br />Attachments <br />Attachment A: Resolution 2018-035 <br />Attachment B: Assessment Roll <br /> <br /> <br /> <br /> <br />