My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-21-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
05-21-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2018 4:23:39 PM
Creation date
5/17/2018 4:22:16 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />May 22, 2017 <br />Page 2 <br /> <br />For this study, Westwood conducted weekday a.m. and p.m. peak hour turning <br />movement counts at the intersection of County Road 96 and Snelling Avenue. These <br />counts are summarized on Figure 2. The results of these counts show very heavy peak <br />hour traffic volumes on Highway 96, while traffic volumes along Snelling Avenue are <br />relatively light. <br /> <br />In addition, Westwood was asked to look at the traffic volumes at the weekday a.m. <br />and p.m. peak hour traffic volumes at the existing church driveway at Highway 96. <br />Because the counts occurred during weekdays, the trip volumes to and from the church <br />during the a.m. and p.m. peak hours were .very light. <br /> <br />Table 1 illustrates the existing performance and operation of the study intersections. <br />Westwood utilized the industry standard Synchro and SimTraffic software to <br />determine levels of service and queuing lengths. Levels of service are defined in the <br />Appendix. The 95th-percentile queue is defined as the length of the queue (in vehicles) <br />that has only a 5-percent probability of being exceeded during the analysis time period. <br /> <br />Table 1 – Existing Operational Performance and Queuing <br /> <br />(Source: Westwood Professional Services, 2017) <br />Intersection <br />Delay and <br />LOS <br />Level of <br />Service <br />Approach <br />Delay <br />(sec) <br />95th %ile <br />Queue <br />(ft) <br />Intersection <br />Delay and <br />LOS <br />Level of <br />Service <br />Approach <br />Delay <br />(sec) <br />95th %ile <br />Queue <br />(ft) <br />EB Left - - <br />EB Thru A 1.2 A 2.0 19 <br />EB Right A 2.0 A 1.9 7 <br />WB Left B 10.9 10 D 31.0 45 <br />WB Thru A 4.3 18 A 3.7 11 <br />WB Right - - <br />NB Left F 630.0 615 F 1603.6 523 <br />NB Thru - - <br />NB Right F 472.0 615 F 1957.4 523 <br />SB Left - - <br />SB Thru - - <br />SB Right - - <br />EB Left - - <br />EB Thru A 0.2 A 1.1 <br />EB Right A 0.1 - <br />WB Left A 5.3 15 - <br />WB Thru A 1.7 A 1.5 <br />WB Right - - <br />NB Left -8 -20 <br />NB Thru - - <br />NB Right A 2.0 8 B 14.0 20 <br />SB Left - - <br />SB Thru - - <br />SB Right - - <br />Delay = 1.1 <br />LOS = A <br />Delay = 1.3 <br />LOS = A <br />PM Peak HourAM Peak Hour <br />Existing <br />Delay = 15.7 <br />LOS = C <br />Delay =15.9 <br />LOS = C <br />Highway 96 and <br />Church Access N <br />Intersection Lane Assignment <br />Intersection <br />Traffic <br />Control <br />Highway 96 and <br />Snelling N
The URL can be used to link to this page
Your browser does not support the video tag.