My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-14-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2018
>
05-14-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:21:13 AM
Creation date
6/14/2018 8:21:02 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL – MAY 14, 2018 9 <br /> <br />Larry Stcynske, 1366 West Floral Drive, explained he spent a great deal of money installing a <br />sprinkler system and re-sodding his entire yard. He asked if the contractor would work with him <br />to replace his irrigation system. <br /> <br />Public Works Director/City Engineer Polka stated the contractor would work with Mr. Stcynske <br />on this matter. <br /> <br />Jim Snapko, 1367 Indian Oaks Trail, reported he has landscaping and rocks within eight feet of <br />the road. He requested the City work with him to keep as much of this area undisturbed as possible. <br /> <br />Public Works Director/City Engineer Polka commented the City would work with him. She <br />explained that any trees slated for removal would be marked by the contractor. <br /> <br />Mr. Atwood, 4137 James, asked how the City came up with the 5% interest rate. <br /> <br />Public Works Director/City Engineer Polka indicated the City’s assessment calls for an interest <br />rate that is 2% over the bonding rate, which is 3%. <br /> <br />Mr. Atwood questioned if residents would be charged extra for the sod and repair work. <br /> <br />Public Works Director/City Engineer Polka reported this expense was already included in the <br />contract and assessment amounts. <br /> <br />Ms. Anderson requested all subsoil be compacted to assist settling the dirt. <br /> <br />Steven Anderson, 1361 West Floral Drive, requested staff provide him with further information <br />on the City’s deferral program. <br /> <br />Mayor Grant requested the City’s deferral program information be sent to all residents living in <br />the project area. <br /> <br />Councilmember Holden asked how this area would handle a large rain event if it were to occur <br />while the project area was dug up. <br /> <br />Andy Brotzler, WSB & Associates, explained the contractor would be responsible for maintaining <br />adequate drainage during the entirety of the project. <br /> <br />Councilmember Holmes reported this neighborhood was much smaller than the Venus project and <br />anticipated the 2018 project would be completed quicker than the 2017 project. <br /> <br />Mr. Atwood asked if the contractor would receive a penalty if the project was not completed on <br />time. <br /> <br />Public Works Director/City Engineer Polka stated this was the case. <br /> <br />The Council was asked if the City has worked with Northwest Asphalt in the past. <br />
The URL can be used to link to this page
Your browser does not support the video tag.