My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
06-25-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:58:58 AM
Creation date
6/21/2018 3:49:20 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills - Indian Oaks Area Downstream Drainage Review <br />March 12, 2018 <br />Page 5 <br /> <br /> <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com <br /> <br />- 18” RCP outfall with outlet control structure from IOC Wetland <br />- 18” HDPE pipe from Indian Oaks Court to Colleen Avenue <br />- 18” RCP along Colleen Avenue <br />- Install Additional Inlet at Colleen Avenue Sag for revised sewer configuration and to improve <br />roadway ponding. <br />- Directional drill 12” DR-17 HDPE parallel to existing 15” RCP. Directional drilling new storm sewer <br />will minimize disturbance to adjacent properties and avoid excavation conflicts with utilities and <br />timber retaining wall. See Figure 4 (below). <br />- Re-establish the emergency overflow (EOF) between the Ponding Area and Colleen Avenue and <br />EOF north of the Colleen Avenue sag to 1’ below the adjacent house low opening. <br />- Provide additional riprap at storm sewer outfall to Colleen Wetland. <br />- Raise bituminous trail grade adjacent to the Colleen Wetland to 932.80 at EOF (Approximately <br />200ft of trail improvements). <br />- Outlet control structure with 27” discharge pipe for Colleen Wetland rate control and 18” culvert <br />- Pavement removal/replacement and other associated work. <br /> <br />The 18” discharge pipe option results in a 100-year high water level elevation in the IOC Wetland and <br />Ponding Area of 962.20 and 959.47, respectively. <br /> <br />Figure 4. Colleen Avenue Sag Improvements <br /> <br /> <br /> <br />21”/24” Option <br />The following summarizes the proposed 21”/24” discharge pipe improvements: <br />- 21” RCP outfall with outlet control structure from IOC Wetland
The URL can be used to link to this page
Your browser does not support the video tag.