My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
06-25-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:58:58 AM
Creation date
6/21/2018 3:49:20 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB Project:Arden Hills 2018 PMP Downstream Drainage Improvements Design By:MJS <br />Project Location:City of Arden Hills Checked By:JLS <br />WSB Project No:010111-000 Date:3/12/2018 <br />Item No. Description Unit <br />Estimated <br />Total <br />Quantity <br />Estimated Unit <br />Price <br />Estimated Total <br />Cost <br />1 MOBILIZATION LUMP SUM 1 $7,580.00 $7,580.00 <br />2 CLEARING TREE 25 $300.00 $7,500.00 <br />3 GRUBBING TREE 25 $300.00 $7,500.00 <br />4 REMOVE SEWER PIPE (STORM)LIN FT 280 $15.00 $4,200.00 <br />5 REMOVE CONCRETE CURB AND GUTTER LIN FT 330 $5.00 $1,650.00 <br />6 REMOVE DRAINAGE STRUCTURE EACH 2 $300.00 $600.00 <br />7 REMOVE BITUMINOUS WALK SQ FT 1,600 $1.75 $2,800.00 <br />8 REMOVE BITUMINOUS PAVEMENT SQ YD 655 $6.00 $3,930.00 <br />9 SAWING PAVEMENT (FULL DEPTH)LIN FT 400 $5.00 $2,000.00 <br />10 SALVAGE AND REINSTALL MAILBOX EACH 2 $100.00 $200.00 <br />11 COMMON EMBANKMENT (CV)CU YD 160 $30.00 $4,800.00 <br />12 SUBGRADE EXCAVATION CU YD 430 $15.00 $6,450.00 <br />13 SELECT GRANULAR BORROW (CV)CU YD 130 $24.00 $3,120.00 <br />14 GEOTEXTILE FABRIC TYPE V SQ YD 1,050 $1.75 $1,837.50 <br />15 SUBGRADE PREPARATION ROAD STA 4 $180.00 $720.00 <br />16 AGGREGATE BASE CLASS 5 TON 160 $20.00 $3,200.00 <br />17 BITUMINOUS WALK SQ YD 180 $25.00 $4,500.00 <br />18 BITUMINOUS ROADWAY PAVMENT TON 50 $120.00 $6,000.00 <br />19 UTILITY COORDINATION LUMP SUM 1 $1,000.00 $1,000.00 <br />20 CONCRETE CURB & GUTTER LIN FT 330 $22.00 $7,260.00 <br />21 DEWATERING LUMP SUM 1 $1,000.00 $1,000.00 <br />22 12" GS PIPE APRON EACH 1 $250.00 $250.00 <br />23 24" GS PIPE APRON EACH 1 $350.00 $350.00 <br />24 CONNECT TO EXISTING STORM SEWER EACH 4 $850.00 $3,400.00 <br />25 15" RC PIPE SEWER LIN FT 20 $45.00 $900.00 <br />26 12" HDPE (DIRECTIONAL DRILL)LIN FT 130 $120.00 $15,600.00 <br />27 24" CP PIPE CULVERT LIN FT 10 $42.00 $420.00 <br />28 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 LIN FT 16 $400.00 $6,400.00 <br />29 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL EACH 1 $9,000.00 $9,000.00 <br />30 RANDOM RIPRAP CLASS IV CU YD 40 $100.00 $4,000.00 <br />31 CASTING ASSEMBLY EACH 3 $750.00 $2,250.00 <br />32 4" PERF PE PIPE DRAIN LIN FT 100 $9.00 $900.00 <br />33 18" GS PIPE APRON EACH 2 $300.00 $600.00 <br />34 27" RC PIPE APRON EACH 1 $950.00 $950.00 <br />35 18" CP PIPE CULVERT LIN FT 20 $40.00 $800.00 <br />36 18" RC PIPE SEWER LIN FT 250 $55.00 $13,750.00 <br />37 27" RC PIPE CULVERT LIN FT 25 $90.00 $2,250.00 <br />38 ORIFICE PLATES EACH 2 $900.00 $1,800.00 <br />39 TRAFFIC CONTROL LUMP SUM 1 $2,000.00 $2,000.00 <br />40 STREET SWEEPER (WITH PICKUP BROOM) HOUR 20 $115.00 $2,300.00 <br />41 WATER (DUST CONTROL)MGAL 10 $45.00 $450.00 <br />42 SILT FENCE, TYPE MACHINE SLICED LIN FT 500 $3.00 $1,500.00 <br />43 SEDIMENT CONTROL LOG LIN FT 500 $4.00 $2,000.00 <br />44 SODDING TYPE LAWN SQ YD 350 $7.00 $2,450.00 <br />45 HYDRO-SEEDING SQ YD 400 $3.50 $1,400.00 <br />Opinion of Probable Cost <br />PHASE 2 - DOWNSTREAM DRAINAGE IMPROVMENTS: 18" OPTION <br />K:\010111-000\Admin\Docs\Downstream Drainage Study Memo\Estimate and Information\Opinion of Probable Cost
The URL can be used to link to this page
Your browser does not support the video tag.