My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-09-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
07-09-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2018 4:11:57 PM
Creation date
7/5/2018 4:11:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> <br /> CONSENT ITEM – 6D <br /> <br /> MEMORANDUM <br /> <br /> <br />DATE: July 9, 2018 <br /> <br />TO: Honorable Mayor and City Councilmembers <br /> David Perrault, City Administrator <br /> <br />FROM: Sue Polka, Public Works Director/ City Engineer <br /> <br />SUBJECT: Cummings Park Playground Replacement <br /> <br />Budgeted Amount: Actual Amount: Funding Source: <br /> $125,000 $19,210 PIR <br /> <br /> <br /> <br />Council Should Consider <br />Authorize the scope and fee for the design and construction services for the Cummings Park <br />playground and structures with WSB in the amount of $19,210. <br /> <br />Background/Discussion <br />The existing play structure at Cummings Park was installed in the summer of 1998. The play <br />structure is a steel structure that is showing signs of wear. The wood surrounding the structure is <br />in poor condition and the steel is rusting. The playground area no longer meets accessibility <br />standards or safety guidelines and will be brought into compliance. The 2018 Capital <br />Improvement Program (CIP) identified the play structure replacement in 2018 (Attachment A). <br /> <br />The playground at Cummings Park receives heavy use during evening sports events and the <br />City’s summer playground program. The trail connections around Cummings Park make it <br />easily accessible for many families in Arden Hills. <br /> <br />WSB has provided a scope and fee for design and construction services. We plan to issue a <br />request for proposals for the project to ensure a competitive process for both the site work that <br />will be required as well as the playground equipment. <br /> <br />Attachments <br /> <br />A - 2018 CIP, Playground Structure Replacement <br />B – WSB Proposal
The URL can be used to link to this page
Your browser does not support the video tag.