My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
07-16-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 8:24:58 AM
Creation date
7/13/2018 8:18:37 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Targets for New Facility or Renovation Project <br />Based on the City Hall’s programmatic needs as well as on the review of the existing site included in this report, the <br />following strategies are recommended for consideration for any new construction or renovation project for the City of <br />Arden Hills City Hall. Strategies should be revisited and amended as appropriate as project concepts are developed. <br />Site Characteristics: <br />Tree Canopy Cover: >37% <br />Total Impervious Surface: <24% <br />Recommended B3 strategies (in addition to “Required” strategies): <br />Maximize tree canopy contribution by planting trees to cover/shade paved areas, goal of 50% of non-parking surfaces <br />shaded within five years and 50% of parking surfaces shaded within ten years. <br />Minimize impervious surface area through use of green roof assemblies. <br />Minimize heat island impact through use of green roof assemblies and/or use of ENERGY STAR roof-compliant, high- <br />reflectance, AND high emissivity roofing (initial reflectance of at least 0.65 and 3-year-aged reflectance of at least 0.5 <br />when tested in accordance with ASTM #903 and emissivity of at least 0.9 when tested in accordance with ASTM 408) for a <br />minimum of 75% of the roof surface. <br />Reduce transportation impacts by: <br />· Locating the building within 0.25 mile of one or more bus lines. <br />· Providing means for securing bicycles, with convenient changing/shower facilities for use by cyclists, for 5% or <br />more of building occupants <br />· Installing alternative-fuel refueling or plug-in electric vehicle charging station(s) for 3% of the total vehicle <br />parking capacity. <br />Energy and Atmosphere: <br />Recommended B3 strategies: <br />Increase energy efficiency of building to meet SB2030 Energy Standards. Recommended minimum EUI target of 44.5 as <br />reviewed in Section 2 of this report. <br />Provide a minimum of 25% of the building’s energy needs through on-site renewable energy (solar or wind). Minimize <br />impervious surface impact of solar installation by installing array on roof surfaces not receiving green roof assemblies, <br />integrated with green roof assemblies, integrated into building facades and sun control devices, or installed over <br />pavement sections as carport/shade device. <br />Meet the Atmospheric Protection requirements of B3 strategy E.4. <br />Indoor Environmental Quality: <br />Recommended B3 strategies (in addition to “Required” strategies): <br />Meet the View Space and Window Access requirements of B3 strategy I.9. <br />Materials and Waste: <br />Meet all “Required” B3 strategies. <br />Site Sustainability Metrics <br />4- 3 City of Arden Hills Energy and Sustainability
The URL can be used to link to this page
Your browser does not support the video tag.