My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-18-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
07-16-18-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2018 8:24:58 AM
Creation date
7/13/2018 8:18:37 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lift Station Rehab Sewer $100,000 <br />Rehabilitation needed for stations 10, 3 and 14. <br />Sewer Lining/Rehab Sewer $200,000 <br />As part of our sanitary sewer program, lines found with holes and cracks allowing for <br />infiltration should be lined or repaired as needed. <br />SCADA System Sewer/Water $25,000 <br />Planning and design work needed for new equipment to bring efficiencies to utility <br />operations. <br />Karth Lake Shoreline Surface Water Mgmt $150,000 <br />Existing retaining wall is in need of repairs and work is needed on lift station system. <br />Storm Pond Maintenance Surface Water Mgmt $100,000 <br />Pond outfall maintenance is required by the City’s MS4 permit issued by the MPCA. <br />Booster Station Water $300,000 <br />Repairs necessary for maintenance and compliance, cost shared with Roseville based on <br />agreement. <br />Watermain Replacement Water $250,000 <br />Placeholder for watermain replacements throughout the City. <br />Projects in 2019 <br />Project Fund Source Amount
The URL can be used to link to this page
Your browser does not support the video tag.