My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-18 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2018
>
01-17-18 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 10:47:43 AM
Creation date
7/25/2018 10:47:38 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />regional trail for bicycles and pedestrians. An off-ramp from I-35W northbound directly to County <br />Road H was constructed. The U.S. Highway 10 westbound ramp to I-35W northbound was <br />reconstructed to go over the new County Road H ramp. The project also included construction <br />of a noise wall along I-35W southbound between County Road I and County Road H2. Two <br />roundabouts, one at each ramp terminal on either side of I-35W, were constructed. <br /> <br />Ramsey County constructed improvements on County Road I near Rice Creek Parkway and <br />Old Highway 8. The new roadway is an extension of Old Highway 8 between County Roads H <br />and I. The 2017 improvements included a roundabout, trail access, raised medians, and a new <br />roadway which will enhance safety and access to the developing Rice Creek Commons. The <br />construction schedule will resume in 2018 with work to complete sidewalks and trails, lighting <br />and final roadway striping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.