My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-02-18 JDA Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2018
>
04-02-18 JDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2018 10:48:24 AM
Creation date
7/25/2018 10:47:55 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />• Modifications to Sites D and G located on AHATS include installation of additional extraction <br />wells and implementation of targeted 1,4-dioxane treatment. These changes have no impact on <br />RCC redevelopment. <br />• Long-term objectives identified by the study include discontinuing operation of TGRS boundary <br />wells entirely (wells identified by 'B'). This change will not occur in a time frame that will impact <br />planned redevelopment activities. <br />• The study does not contemplate any changes to the existing water treatment plant building <br />located on RCC. <br />• Appendix A of the report specifically addresses well adjustments discussed at a meeting in <br />August 2017 between the Army and representatives of the RCC redevelopment team. The <br />appendix identifies vertical and horizontal well adjustments that the Army supports to <br />accommodate redevelopment infrastructure. <br />• The study recommendations do not preclude the construction of a low-temperature district <br />energy system as was identified in the TCAAP Energy Integration Resiliency Framework (EIRF). <br /> <br />The RCC redevelopment team will continue to work with the Army to ensure these adjustments are <br />approved prior to being implemented along with construction of site infrastructure. <br /> <br /> <br />Attachment: <br />1. October 7, 2017 JDA Staff Memo <br />2. TCAAP Operable Unit Remedy Review – OU2 Site Map <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.