My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-18-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2018
>
08-13-18-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2018 4:19:31 PM
Creation date
8/9/2018 4:17:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 2564.531 <br />SIGN PANELS <br />TYPE C S F $45.00 38 0 $0.00 0 $0.00 <br />39 2564.602 <br />INSTALL SIGN <br />TYPE SPECIAL EACH $150.00 6 0 $0.00 0 $0.00 <br />40 2572.502 <br />CLEAN ROOT <br />CUTTING L F $8.00 150 0 $0.00 0 $0.00 <br />41 2573.502 <br />SILT FENCE, <br />TYPE MS L F $1.90 1370 0 $0.00 36 $68.40 <br />42 2573.530 <br />STORM DRAIN <br />INLET <br />PROTECTION <br />EACH $95.00 48 0 $0.00 0 $0.00 <br />43 2573.533 <br />SEDIMENT <br />CONTROL LOG <br />TYPE WOOD <br />FIBER <br />L F $3.00 3723 0 $0.00 510 $1,530.00 <br />44 2573.533 <br />SEDIMENT <br />CONTROL LOG <br />TYPE ROCK <br />L F $7.50 150 0 $0.00 0 $0.00 <br />45 2573.535 <br />STABILIZED <br />CONSTRUCTION <br />EXIT <br />LS $5,000.00 1 0 $0.00 0 $0.00 <br />46 2574.508 <br />FERTILIZER TYPE <br />3 LB $0.75 460 0 $0.00 0 $0.00 <br />47 2574.525 <br />BOULEVARD <br />TOPSOIL <br />BORROW <br />C Y $21.00 1230 0 $0.00 0 $0.00 <br />48 2575.505 <br />SODDING TYPE <br />LAWN S Y $4.15 10040 0 $0.00 0 $0.00 <br />49 2575.523 <br />EROSION <br />CONTROL <br />BLANKETS <br />CATEGORY 3 <br />S Y $1.65 2508 0 $0.00 0 $0.00 <br />50 2575.535 <br />WATER (TURF <br />ESTABLISHMENT)MGAL $15.00 170 0 $0.00 0 $0.00 <br />51 2575.560 <br />HYDRAULIC <br />MULCH MATRIX LB $0.50 5700 0 $0.00 0 $0.00 <br />52 2582.502 <br />4" SOLID LINE <br />EPOXY L F $1.00 20 0 $0.00 0 $0.00 <br />53 2582.502 <br />4" DBLE SOLID <br />LINE EPOXY L F $1.00 20 0 $0.00 0 $0.00 <br />54 2582.503 <br />CROSSWALK <br />EPOXY S F $3.41 275 0 $0.00 0 $0.00 <br />Totals For Section SCHEDULE A. SURFACE IMPROVEMENTS - <br />FULL RECONSTRUCTION AREA:$7,580.97 $30,570.97 <br />SCHEDULE B. SANITARY SEWER IMPROVEMENTS - FULL RECONSTRUCTION AREA <br />55 2104.501 <br />REMOVE SEWER <br />PIPE (SANITARY)L F $10.00 60 86 $860.00 86 $860.00 <br />56 2104.501 <br />REMOVE <br />SANITARY <br />SERVICE PIPE <br />L F $3.00 200 11 $33.00 11 $33.00 <br />R-010111-000 Project Material Status <br />Line Item Description Units Unit Price <br />Contract <br />Quantity <br />Quantity <br />This <br />Pay <br />Voucher <br />Amount This <br />Pay Voucher <br />Quantity <br />To Date <br />Amount <br />To Date <br />CITY OF ARDEN HILLS <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br />Project No. R-010111-000 <br />Pay Voucher No. 2 <br />Page 5
The URL can be used to link to this page
Your browser does not support the video tag.