Page 2 of 2 <br /> <br />Change Order No. 1 is for necessary work associated with the project. It includes helical piles <br />needed for retaining wall #3 to mitigate the soil conditions encountered, additional tracer wire <br />for the watermain, and pavement striping removal for the traffic shift along Old Snelling and <br />County Road E. The change order reflects an increase of $142,675.38, or 4.2% of the original <br />contract amount. Change Order No. 2 includes an increase in grading materials necessary to meet <br />the requirement for compaction due to the wet soil conditions encountered under the roadway <br />while installing utilities and widening for the trail along the roadway. This change order reflects <br />a net increase of $219,014.45, or an increase of 6.5% of the original contract amount. WSB <br />recommends approval of Change Orders No. 1 and 2 (Attachment A). Change Orders No. 1 and <br />2 are included as Attachments B and C. <br /> <br />The trail and watermain portions of the project are underway and the project is approximately <br />46% complete with removals completed, storm sewer work underway, watermain nearing <br />completion, the CR E2 trail nearing completion and the CR E and Old Snelling trails graded. <br />Five percent is being withheld from the work completed in accordance with the contract <br />documents. The third payment is in the amount of $776,494.00. WSB has provided a <br />recommendation to pay the first voucher (Attachment D). Staff recommends that Council <br />approve Payment No. 3 (Attachment E). <br /> <br /> <br />Attachments <br /> <br />Attachment A: WSB Letter – Change Orders No. 1 and 2 <br />Attachment B: Change Order No. 1 <br />Attachment C: Change Order No. 2 <br />Attachment D: WSB Letter – Payment No. 3 <br />Attachment E: Payment No. 3 <br />