My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-07-18 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2018
>
02-07-18 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 3:52:59 PM
Creation date
8/30/2018 3:50:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – February 8, 2017 2 <br /> <br />Ms. Rybak reported a monument sign is a type of freestanding sign where the sign face is <br />mounted on the ground or a base rather than a pole. Sign Districts 4 and 5 only allow monument <br />signs for freestanding signs. For all districts, freestanding signs are allowed a set square footage <br />and height based on the sign district the property is located in. While none of the other cities <br />limit the style of freestanding signs to individual districts, Roseville, New Brighton and Mounds <br />View all regulate them in the same manner as Arden Hills; a set square footage based on sign <br />district. Shoreview allows a set square footage based on the gross floor area of the principal <br />structure. The TCAAP Redevelopment Code allows a set square footage for “Highway <br />Monument Signs” and a percentage of the street frontage for “Corridor Monument Signs.” <br /> <br />Ms. Rybak stated currently, the Sign Code does not allow any electronic or dynamic display <br />signs. All four cities that were reviewed allow for some type of dynamic display signs. They are <br />regulated as follows: <br /> <br />• Roseville: Must be static and remain for a minimum duration of 25 seconds. <br />• New Brighton: No animation or video is permitted and a minimum duration of 8 <br />seconds. <br />• Shoreview: No animation or video is permitted and a minimum duration of 8 <br />seconds. <br />• Mounds View: Must be static and remain for a minimum duration of 8 seconds. <br />• TCAAP Redevelopment Code: Allowed only on “Marquee Signs.” A Marquee <br />Sign is located at a theatre or other public venue and displays the name of the <br />establishment or event details. Message board may be changeable copy provided <br />that the copy does not change more than once every 15 minutes. <br /> <br />Ms. Rybak commented the Sign Code defines a projecting sign as a sign, other than a wall sign, <br />that projects more than 18 inches from the building façade. These types of signs are not permitted <br />in Arden Hills, New Brighton, or Shoreview. Roseville regulates them as a wall sign, and they <br />may only project up to 30 inches from the building façade. Mounds View allows them with a set <br />square footage by zoning district. The TCAAP Redevelopment Code allows the lesser of a set <br />square footage or 15% of the façade area. They may project no more than 50% of the width of the <br />sidewalk, or six feet from the building façade line, whichever is less. <br /> <br />Ms. Rybak explained for temporary signs, Arden Hills allows up to half of the area allowed for <br />permanent wall or freestanding signage to be displayed on three occasions throughout the year, <br />with a maximum of 10 days each time. Businesses may also combine the three occasions to <br />display a temporary sign for one 30-day period per year. Other cities’ regulations are as follows: <br /> <br />• Roseville: Allows a maximum of 32 square feet up to 60 days in one year. <br />• New Brighton: Allows up to 32 square feet on four occasions, up to 14 days each. <br />• Shoreview: Allows either 32 or 64 square feet (depending on building size) on <br />four occasions, up to 14 days each. <br />• Mounds View: Allows temporary signage on four occasions, with a maximum of <br />21 days each. Can obtain a fifth permit for a banner only. <br />• TCAAP Redevelopment Code: Maximum area of 150 square feet or 10% of the <br />façade area, whichever is less. Maximum of thirty days per calendar year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.