My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-04-18 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2018
>
04-04-18 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:28:56 PM
Creation date
8/30/2018 4:27:15 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – March 7, 2018 5 <br /> <br />plan would include 45,000 gross square feet of renovations within the existing Academic <br />Commons building and a new 20,000 gross square foot addition on the northwest corner of the <br />building on an existing small parking lot. The addition would match the height of the existing <br />three-story Academic Commons building. The proposed renovations and addition are needed to <br />support science academic programs on the campus. <br /> <br />City Planner Bachler explained the design for the sciences renovations and addition is still in <br />the early schematic phase. Bethel University anticipates the project will be built in four phases. <br />The first three phases would include interior renovations to the existing building and would take <br />place between summer 2019 and summer 2021. The current schedule is to construct the proposed <br />addition in summer 2022. Bethel University has requested a CUP Amendment at this time in <br />order to update their Campus Master Plan to include the 20,000-gross square foot addition to the <br />Academic Commons building. The university would be required to submit a separate Site Plan <br />Review application with the City for the addition before construction. Based on the tentative <br />schedule, the Site Plan Review application would likely be submitted in 2021 in anticipation of <br />construction in 2022. <br /> <br />City Planner Bachler commented a Variance is being requested to allow the Academic <br />Commons addition to encroach into the required setback from Valentine Lake. The required <br />structure setback from the ordinary high-water level is 150 feet. The proposed addition would be <br />setback 118 feet from the lakeshore for an encroachment of 32 feet. <br /> <br />City Planner Bachler stated Bethel University operates under a CUP Master Plan. As the <br />university comes forward with plans, they are reviewed against the Master Plan for consistency. <br />Building plans that are consistent with the Master Plan require a Site Plan Review. A CUP <br />Amendment is required when plans are not included in the approved Master Plan. The two <br />proposed additions are not included on the Master Plan and a CUP Amendment is therefore <br />required. <br /> <br />Site Data <br />Land Use Plan: Public and Institutional <br />Existing Land Use: Public and Institutional <br />Zoning: INST – Institutional District <br />Current Lot Sizes: 191.32 Acres (Including main campus, athletic complex, and <br />part of Lake Valentine) <br />Topography: Varied topography across campus <br /> <br />City Planner Bachler reviewed the surrounding area, the Plan Evaluation, the Conditional Use <br />Permit Criteria and the Variance Evaluation Criteria. <br /> <br />City Planner Bachler provided the Findings of Fact for review: <br /> <br />General Findings: <br />1. The Bethel University main campus at 3900 Bethel Drive is located in the Institutional <br />Zoning District. <br />2. A Higher Education, College Campus is a Conditional Use in the Institutional District. <br />3. Bethel University operates under a Conditional Use Permit Master Plan.
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).