Laserfiche WebLink
   178 East 9th Street, Suite 200 | St. Paul, MN 55101 | (651) 286-8450 <br />  <br />  <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com  <br /> <br /> <br />September 7, 2018 <br /> <br /> <br /> <br /> <br /> <br /> <br />City of Arden Hills <br />Attn: Sue Polka, PE, Public Works Director/City Engineer <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: 0.5 MG Water Tower Rehabilitation <br /> Construction Services <br /> <br />Dear Ms. Polka, <br /> <br />The Contractor’s continued work on the 0.5 MG Water Tower Rehabilitation project has required <br />additional construction observation to be provided beyond the contract’s substantial completion date. The <br />total estimated billings will exceed our original proposed budget by $14,911. Therefore, we respectively <br />request an increase of $14,911 to our original budget for the additional construction observation that has <br />been provided by our subconsultant, Badger State Inspection, beyond the substantial completion date <br />until the construction work is substantially completed. If you are in agreement with this contract <br />amendment request, please provide an authorized signature on the line below and return a copy to WSB. <br /> <br />Respectfully Submitted, <br />WSB & Associates, Inc. <br /> <br />Greg F. Johnson, PE <br />Water/Wastewater Group Manager <br /> <br />Accepted By: <br /> <br /> <br />__________________________________ <br />City of Arden Hills, Minnesota <br /> <br />Date:_____________________ <br /> <br /> <br /> <br />